(Removed claim: summary (P836): The project deals with the construction of two retention ponds, and to ensure that, for the purpose of flood protection of the built territory, it has been developed. The implementation of the measures will reduce the flood risk for the current installation of family houses and transport infrastructure. By pressing to avoid uncontrolled water erosion and channelling the flow into the two lower storage tanks, which will ensure a deceleration of...) |
(Created claim: summary (P836): The project deals with the construction of two retention tanks and the enclosure of the ravine for the purpose of flood protection of the built-up area. The implementation of the measures will reduce the flood risk for the existing family houses and transport infrastructure. Blocking the ravine will avoid uncontrolled water erosion and direct the flow into two lower retention tanks, which will slow down the outflow of rainwater, reduce the culmi...) |
||||||||||||||
Property / summary | |||||||||||||||
The project deals with the construction of two retention tanks and the enclosure of the ravine for the purpose of flood protection of the built-up area. The implementation of the measures will reduce the flood risk for the existing family houses and transport infrastructure. Blocking the ravine will avoid uncontrolled water erosion and direct the flow into two lower retention tanks, which will slow down the outflow of rainwater, reduce the culmination of the flood wave and allow it to be smoothly and safely transferred. (English) | |||||||||||||||
Property / summary: The project deals with the construction of two retention tanks and the enclosure of the ravine for the purpose of flood protection of the built-up area. The implementation of the measures will reduce the flood risk for the existing family houses and transport infrastructure. Blocking the ravine will avoid uncontrolled water erosion and direct the flow into two lower retention tanks, which will slow down the outflow of rainwater, reduce the culmination of the flood wave and allow it to be smoothly and safely transferred. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project deals with the construction of two retention tanks and the enclosure of the ravine for the purpose of flood protection of the built-up area. The implementation of the measures will reduce the flood risk for the existing family houses and transport infrastructure. Blocking the ravine will avoid uncontrolled water erosion and direct the flow into two lower retention tanks, which will slow down the outflow of rainwater, reduce the culmination of the flood wave and allow it to be smoothly and safely transferred. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 11:17, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Silver ch. No. 163/5 — retention INSTRUMENTS |
Project in Czech Republic financed by DG Regio |
Statements
2,172,925.27 Czech koruna
0 references
2,556,382.68 Czech koruna
0 references
85.0 percent
0 references
3 June 2019
0 references
30 June 2020
0 references
Město Kraslice
0 references
35801
0 references
Projekt řeší výstavbu dvou retenčních nádrží a zahrazení strže za účelem protipovodňové ochrany zastavěného území. Realizací opatření dojde ke snížení povodňového rizika pro stávající zástavbu rodinných domů a dopravní infrastrukturu. Zahrazením strže dojde k zamezení nekontrolované vodní eroze a usměrnění toku do dvou níže položených retenčních nádrží, které zajistí zpomalení odtoku srážkových vod, sníží kulminaci povodňové vlny a umožní její plynulé a bezpečné převedení. (Czech)
0 references
The project deals with the construction of two retention tanks and the enclosure of the ravine for the purpose of flood protection of the built-up area. The implementation of the measures will reduce the flood risk for the existing family houses and transport infrastructure. Blocking the ravine will avoid uncontrolled water erosion and direct the flow into two lower retention tanks, which will slow down the outflow of rainwater, reduce the culmination of the flood wave and allow it to be smoothly and safely transferred. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/17_074/0006987
0 references