Improving the quality and accessibility of the education infrastructure in the Primary School. M. Plesinger-Božov Neratovice (Q57096): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project is based on the Strategic Framework of the MAP SO ODA. The aim is to develop KK’s pupils in re-entering the labour market and ensuring access to education for pupils with the GSP. In conjunction with the MAP, an analysis of the needs of the school was carried out, proposing the best solution for investing in building vocational classrooms, enhancing internal connectivity of the internet and adjusting green spaces to outdoor areas....)
(‎Created claim: summary (P836): The project is based on the Strategic Framework of MAP SO ORP Neratovice. The aim is to develop KK pupils in relation to employment on the labour market and to ensure access to education of pupils with the GEI. In connection with the MAP, an analysis of the needs of the school was carried out, the best investment solution was proposed, thanks to the construction of professional classrooms, the internal connectivity of the Internet and the greene...)
Property / summary
 
The project is based on the Strategic Framework of MAP SO ORP Neratovice. The aim is to develop KK pupils in relation to employment on the labour market and to ensure access to education of pupils with the GEI. In connection with the MAP, an analysis of the needs of the school was carried out, the best investment solution was proposed, thanks to the construction of professional classrooms, the internal connectivity of the Internet and the greenery in the school’s outdoors. There will be an increase in the quality of teaching and cooperation with schools and the promotion of free-time education. (English)
Property / summary: The project is based on the Strategic Framework of MAP SO ORP Neratovice. The aim is to develop KK pupils in relation to employment on the labour market and to ensure access to education of pupils with the GEI. In connection with the MAP, an analysis of the needs of the school was carried out, the best investment solution was proposed, thanks to the construction of professional classrooms, the internal connectivity of the Internet and the greenery in the school’s outdoors. There will be an increase in the quality of teaching and cooperation with schools and the promotion of free-time education. (English) / rank
 
Normal rank
Property / summary: The project is based on the Strategic Framework of MAP SO ORP Neratovice. The aim is to develop KK pupils in relation to employment on the labour market and to ensure access to education of pupils with the GEI. In connection with the MAP, an analysis of the needs of the school was carried out, the best investment solution was proposed, thanks to the construction of professional classrooms, the internal connectivity of the Internet and the greenery in the school’s outdoors. There will be an increase in the quality of teaching and cooperation with schools and the promotion of free-time education. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:10, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Improving the quality and accessibility of the education infrastructure in the Primary School. M. Plesinger-Božov Neratovice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    6,387,499.25 Czech koruna
    0 references
    255,499.97 Euro
    1 October 2020
    0 references
    7,514,705.0 Czech koruna
    0 references
    300,588.2 Euro
    1 October 2020
    0 references
    85 percent
    0 references
    31 December 2019
    0 references
    Město Neratovice
    0 references
    0 references

    50°15'40.7"N, 14°30'46.1"E
    0 references
    27711
    0 references
    Projekt vychází ze Strategického rámce MAP SO ORP Neratovice. Cílem je rozvoj KK žáků v relaci na uplatnění na trhu práce a zajištění přístupu ke vzdělávání žáků s SVP. Ve vazbě na MAP byla provedena analýza potřeb školy, bylo navrženo nejlepší řešení pro investici, díky které dojde k vybudování odborných učeben, posílení vnitřní konektivity internetu a úprava zeleně na venkovním prostranství školy. Dojde ke zvýšení kvality výuky a ke spolupráci se školami a podpoře volnočasového vzdělávání. (Czech)
    0 references
    The project is based on the Strategic Framework of MAP SO ORP Neratovice. The aim is to develop KK pupils in relation to employment on the labour market and to ensure access to education of pupils with the GEI. In connection with the MAP, an analysis of the needs of the school was carried out, the best investment solution was proposed, thanks to the construction of professional classrooms, the internal connectivity of the Internet and the greenery in the school’s outdoors. There will be an increase in the quality of teaching and cooperation with schools and the promotion of free-time education. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.2.67/0.0/0.0/16_063/0004175
    0 references