Construction of a new building site (Q57786): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will build a new first level structure of the existing Primary School, including 4 new vocational classrooms (2 x language classroom, ICT and science textbooks) and other related areas, the internal connectivity of the school will be assured and the school’s outdoor accommodation will be adapted. The implementation of the project will therefore fulfil the specific objective 2.4. — Enhancing the quality and accessibility of educatio...) |
(Created claim: summary (P836): As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of in...) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of infrastructure for education and lifelong learning, ITI strategy measures 3.2.1. (English) | |||||||||||||||
Property / summary: As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of infrastructure for education and lifelong learning, ITI strategy measures 3.2.1. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of infrastructure for education and lifelong learning, ITI strategy measures 3.2.1. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:59, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a new building site |
Project in Czech Republic financed by DG Regio |
Statements
53,016,300.57 Czech koruna
0 references
62,372,118.32 Czech koruna
0 references
85.0 percent
0 references
31 December 2019
0 references
Město Roztoky
0 references
25263
0 references
V rámci projektu bude vybudován nový objekt prvního stupně stávající Základní školy Roztoky včetně 4 nových odborných učeben (2 x jazyková učebna, učebna ICT a učebna přírodních věd) a ostatních souvisejících ploch, zajištěna bude vnitřní konektivita školy a provedeny budou i úpravy venkovních prostranství školy. Realizací projektu tedy dojde k naplnění specifického cíle 2.4. - Zvýšení kvality a dostupnosti infrastruktury pro vzdělávání a celoživotní učení, opatření strategie ITI 3.2.1. (Czech)
0 references
As part of the project, a new building will be built of the existing Primary School Roztoky, including 4 new professional classrooms (2 x language classroom, ICT classroom and science classroom) and other related areas, the school’s internal connectivity will be ensured and the school’s outdoor spaces will be modified. The implementation of the project will therefore meet the specific objective 2.4. — Improving the quality and availability of infrastructure for education and lifelong learning, ITI strategy measures 3.2.1. (English)
23 October 2020
0 references
Identifiers
CZ.06.2.67/0.0/0.0/16_066/0006146
0 references