I/21 — Drmoul — Drmoul (Q57730): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Removed claim: summary (P836): The purpose of the project is the construction of road I/21 in the total length of the main route 5.012 km in category S 11,5/80, which is treated as the Eastern bypass of the Municipality of Trlumice and Drmoul. Implementation of the project will lead to the payment of transit traffic away from the built-up area of the municipality in order to reduce the burden of the population by noise and exile. There will also be an increase in traffic fl...)
Property / summary
The purpose of the project is the construction of road I/21 in the total length of the main route 5.012 km in category S 11,5/80, which is treated as the Eastern bypass of the Municipality of Trlumice and Drmoul. Implementation of the project will lead to the payment of transit traffic away from the built-up area of the municipality in order to reduce the burden of the population by noise and exile. There will also be an increase in traffic flows on the I/21 road, the shortening of journey times and the increase in road safety, including pedestrian safety, in the municipalities. (English)
 
Property / summary: The purpose of the project is the construction of road I/21 in the total length of the main route 5.012 km in category S 11,5/80, which is treated as the Eastern bypass of the Municipality of Trlumice and Drmoul. Implementation of the project will lead to the payment of transit traffic away from the built-up area of the municipality in order to reduce the burden of the population by noise and exile. There will also be an increase in traffic flows on the I/21 road, the shortening of journey times and the increase in road safety, including pedestrian safety, in the municipalities. (English) / rank
Normal rank
 

Revision as of 10:55, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
I/21 — Drmoul — Drmoul
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    432,688,730.25 Czech koruna
    0 references
    17,307,549.21 Euro
    10 January 2020
    0 references
    509,045,565.0 Czech koruna
    0 references
    20,361,822.6 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    8 March 2018
    0 references
    30 September 2020
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/21 v celkové délce hlavní trasy 5,012 km v kategorii S 11,5/80, která je řešena jako východní obchvat obcí Trstěnice a Drmoul. Realizací projektu dojde k odvedení tranzitní dopravy mimo zástavbu obce a sníží se tak zátěž obyvatelstva hlukem a exhalacemi. Dojde rovněž ke zvýšení plynulosti dopravy na silnici I/21, zkrácení jízdní doby a zvýšení bezpečnosti silničního provozu v obcích Trstěnice a Drmoul včetně bezpečnosti chodců. (Czech)
    0 references

    Identifiers

    CZ.04.3.42/0.0/0.0/15_004/0000182
    0 references