Reconstruction of the Office of Libonne (Q60757): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is to reconstruct the construction and machinery parts of Libonne water and related objects in such a way as to ensure that the drinking water is delivered to the water network of the Hořice group in sufficient quantity and quality, in line with the rules in force. The main objective of the project is, in particular, to improve the quality of drinking water by effectively reducing the content of manganese, iron and n...)
(‎Created claim: summary (P836): The purpose of the project is to complete reconstruction of the construction and machine part of the water treatment plant Libonice and related buildings in order to ensure the supply of drinking water to the water supply network of the group water supply Hořice in sufficient quantity and quality corresponding to the applicable regulations. The main objective of the project is to increase the quality of drinking water thanks to effective reducti...)
Property / summary
 
The purpose of the project is to complete reconstruction of the construction and machine part of the water treatment plant Libonice and related buildings in order to ensure the supply of drinking water to the water supply network of the group water supply Hořice in sufficient quantity and quality corresponding to the applicable regulations. The main objective of the project is to increase the quality of drinking water thanks to effective reduction of manganese, iron and nickel content in water installed by raw water treatment technology. (English)
Property / summary: The purpose of the project is to complete reconstruction of the construction and machine part of the water treatment plant Libonice and related buildings in order to ensure the supply of drinking water to the water supply network of the group water supply Hořice in sufficient quantity and quality corresponding to the applicable regulations. The main objective of the project is to increase the quality of drinking water thanks to effective reduction of manganese, iron and nickel content in water installed by raw water treatment technology. (English) / rank
 
Normal rank
Property / summary: The purpose of the project is to complete reconstruction of the construction and machine part of the water treatment plant Libonice and related buildings in order to ensure the supply of drinking water to the water supply network of the group water supply Hořice in sufficient quantity and quality corresponding to the applicable regulations. The main objective of the project is to increase the quality of drinking water thanks to effective reduction of manganese, iron and nickel content in water installed by raw water treatment technology. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:54, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the Office of Libonne
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    27,353,622.8 Czech koruna
    0 references
    1,094,144.91 Euro
    10 January 2020
    0 references
    42,907,643.61 Czech koruna
    0 references
    1,716,305.74 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    17 September 2018
    0 references
    31 May 2021
    0 references
    Vodohospodářská a obchodní společnost, a.s.
    0 references
    0 references

    50°26'15.14"N, 15°19'55.52"E
    0 references
    50601
    0 references
    Účelem projektu je kompletní rekonstrukce stavební a strojní části úpravny vody Libonice a souvisejících objektů tak, aby byla zajištěna dodávka pitné vody do vodovodní sítě skupinového vodovodu Hořice v dostatečném množství a kvalitě odpovídající platným předpisům. Hlavním cílem projektu je zejména zvýšení kvality pitné vody díky efektivnímu snížení obsahu manganu, železa a niklu ve vodě instalovanou technologií úpravy surové vody. (Czech)
    0 references
    The purpose of the project is to complete reconstruction of the construction and machine part of the water treatment plant Libonice and related buildings in order to ensure the supply of drinking water to the water supply network of the group water supply Hořice in sufficient quantity and quality corresponding to the applicable regulations. The main objective of the project is to increase the quality of drinking water thanks to effective reduction of manganese, iron and nickel content in water installed by raw water treatment technology. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_043/0004793
    0 references