The Digital flood management plan of the municipality of Šindell and the construction of an alert and information system (Q58967): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The municipality of Šindell has a flood management plan in the classical format of MS Office.The current form does not allow a full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrolling service. The plan does not take into account the newly defined critical points of exemplary floods, defined by studies from the Karlovy V...) |
(Created claim: summary (P836): The municipality of Šindelová has prepared a flood plan in the classic form of MS Office environment formats.The existing form does not allow full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrol service. The plan does not take into account the newly defined critical points of flood flooding defined by the study of the Kar...) |
||||||||||||||
Property / summary | |||||||||||||||
The municipality of Šindelová has prepared a flood plan in the classic form of MS Office environment formats.The existing form does not allow full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrol service. The plan does not take into account the newly defined critical points of flood flooding defined by the study of the Karlovy Vary Region “Risk Territories in extreme torrential rainfall”. (English) | |||||||||||||||
Property / summary: The municipality of Šindelová has prepared a flood plan in the classic form of MS Office environment formats.The existing form does not allow full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrol service. The plan does not take into account the newly defined critical points of flood flooding defined by the study of the Karlovy Vary Region “Risk Territories in extreme torrential rainfall”. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The municipality of Šindelová has prepared a flood plan in the classic form of MS Office environment formats.The existing form does not allow full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrol service. The plan does not take into account the newly defined critical points of flood flooding defined by the study of the Karlovy Vary Region “Risk Territories in extreme torrential rainfall”. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:51, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The Digital flood management plan of the municipality of Šindell and the construction of an alert and information system |
Project in Czech Republic financed by DG Regio |
Statements
940,542.68 Czech koruna
0 references
1,343,632.4 Czech koruna
0 references
70 percent
0 references
30 September 2018
0 references
Obec Šindelová
0 references
35801
0 references
Obec Šindelová má zpracovaný povodňový plán v klasické podobě formátů prostředí MS Office.Stávající forma neumožňuje plnohodnotnou prezentaci plánu a důležitých dat z nových koncepčních a strategických materiálů občanům. Neumožňuje generování povodňových map jako podklad pro hlídkovou službu. Plán nezohledňuje nově vymezené kritické body přívalových povodní definované studií Karlovarského kraje "Riziková území při extrémních přívalových srážkách".VIS obec nemá v současné době žádný. (Czech)
0 references
The municipality of Šindelová has prepared a flood plan in the classic form of MS Office environment formats.The existing form does not allow full presentation of the plan and important data from new conceptual and strategic materials to citizens. It does not allow the generation of flood maps as a basis for the patrol service. The plan does not take into account the newly defined critical points of flood flooding defined by the study of the Karlovy Vary Region “Risk Territories in extreme torrential rainfall”. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/17_063/0005329
0 references