Drhohog sewerage system and waste water treatment plant (Q60601): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The new construction of the sewage sewerage system and the wastewater treatment plant, which will be finished at the central filling station on the east of the municipality, with a displacement to a new waste water treatment plant. The new waste water treatment plant will be placed under a municipality in the bank of the Drhovah’s pond to which the treated waste water is discharged. The project will build the acceleration of the gravitational...)
(‎Created claim: summary (P836): New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stati...)
Property / summary
 
New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stations 1 and 2, displacement series in length 306 metres and WWTP with a capacity of 300 EO. (English)
Property / summary: New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stations 1 and 2, displacement series in length 306 metres and WWTP with a capacity of 300 EO. (English) / rank
 
Normal rank
Property / summary: New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stations 1 and 2, displacement series in length 306 metres and WWTP with a capacity of 300 EO. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:45, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Drhohog sewerage system and waste water treatment plant
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    13,767,461.52 Czech koruna
    0 references
    550,698.46 Euro
    10 January 2020
    0 references
    21,596,018.08 Czech koruna
    0 references
    863,840.72 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    8 January 2018
    0 references
    28 February 2020
    0 references
    Obec Drhovy
    0 references
    0 references
    0 references

    49°45'41.80"N, 14°11'31.67"E
    0 references
    26301
    0 references
    Novostavba splašková kanalizace a ČOV, která bude ukončena v centrální čerpací stanici na východním okraji obce s výtlakem do nové čistírny odpadních vod. Nová ČOV bude umístěna pod obcí na břehu Drhovského rybníka, do kterého budou vyčištěné odpadní vody vypouštěny. V rámci projektu bude vybudována splašková gravitační splašková kanalizace v délce 1963 m, tlaková kanalizace v délce 214 metrů, čerpací stanice 1 a 2, výtlačné řady v délce 306 metrů a ČOV s kapacitou 300 EO. (Czech)
    0 references
    New building of sewage sewage and sewage treatment plant, which will be completed in the central petrol station on the eastern edge of the village with displacement to a new sewage treatment plant. The new WWTP will be placed under the village on the shore of Drhovský pond, into which the treated waste water will be discharged. The project will build a gravitational sewage sewage system of 1963 m long, 214 metres pressure sewerage, pumping stations 1 and 2, displacement series in length 306 metres and WWTP with a capacity of 300 EO. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004866
    0 references