I/22 Strakonice (Q57697): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The purpose of the project is the construction of the I/22 road in the category MS2 9,5/50, in category MS, in the total length of the main route of 1.540 km, which is being used to assemble the so called North Road for the City of Strakonice. The implementation of the project will lead to the payment of transit traffic away from the building of the city, thus reducing the burden of the population by noise and exile. It will also shorten journ...)
(‎Created claim: summary (P836): The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce tra...)
Property / summary
 
The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/22 and increase road safety, including pedestrian safety. (English)
Property / summary: The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/22 and increase road safety, including pedestrian safety. (English) / rank
 
Normal rank
Property / summary: The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/22 and increase road safety, including pedestrian safety. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:40, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
I/22 Strakonice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    176,533,237.7 Czech koruna
    0 references
    7,061,329.51 Euro
    10 January 2020
    0 references
    207,686,162.0 Czech koruna
    0 references
    8,307,446.48 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    1 March 2017
    0 references
    8 January 2019
    0 references
    8 January 2019
    0 references
    Ředitelství silnic a dálnic ČR
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba přeložky silnice I/22 v kategorii MS2 9,5/50 v celkové délce hlavní trasy 1,540 km, kterou se zkompletuje tzv. Severní dopravní půloblouk města Strakonice. Realizací projektu dojde k odvedení tranzitní dopravy mimo zástavbu města a sníží se tak zátěž obyvatelstva hlukem a exhalacemi. Dojde rovněž ke zkrácení jízdní doby a zvýšení plynulosti dopravy na silnici I/22 a zvýšení bezpečnosti silničního provozu včetně bezpečnosti chodců. (Czech)
    0 references
    The object of the project is the construction of the relocation of road I/22 in category MS2 9.5/50 in the total length of the main route 1.540 km, which will be completed by the so-called Northern transport half arc of the town of Strakonice. The implementation of the project will lead to the transfer of transit traffic outside the city’s construction and thus reduce the burden of the population by noise and exhalations. It will also reduce travel time and increase traffic flow on road I/22 and increase road safety, including pedestrian safety. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.3.42/0.0/0.0/15_004/0000079
    0 references