Flood prevention measures by the city and Otrokovice Otrokovice (Q58765): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project aims at building preventive flood prevention measures by the city and municipalities with extended application of the Otrokovice consisting of the development of a municipal digital flood management plan and a municipality with extended coverage, the construction of a local and alert system in order to improve and improve the system of the flood warning system in line with the basic tasks of the city’s river basin and ORP Otrokovic...) |
(Created claim: summary (P836): The project is aimed at building preventive flood measures of the city and the municipality with extended scope of Otrokovice consisting of the processing of the digital flood plan of the city and the administrative district of the municipality with extended scope, the construction of a local and warning system with the aim of improving and improving the system of flood reporting services in accordance with the basic tasks of the city’s flood au...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is aimed at building preventive flood measures of the city and the municipality with extended scope of Otrokovice consisting of the processing of the digital flood plan of the city and the administrative district of the municipality with extended scope, the construction of a local and warning system with the aim of improving and improving the system of flood reporting services in accordance with the basic tasks of the city’s flood authority and Otrokovice and in accordance with applicable legislation. (English) | |||||||||||||||
Property / summary: The project is aimed at building preventive flood measures of the city and the municipality with extended scope of Otrokovice consisting of the processing of the digital flood plan of the city and the administrative district of the municipality with extended scope, the construction of a local and warning system with the aim of improving and improving the system of flood reporting services in accordance with the basic tasks of the city’s flood authority and Otrokovice and in accordance with applicable legislation. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is aimed at building preventive flood measures of the city and the municipality with extended scope of Otrokovice consisting of the processing of the digital flood plan of the city and the administrative district of the municipality with extended scope, the construction of a local and warning system with the aim of improving and improving the system of flood reporting services in accordance with the basic tasks of the city’s flood authority and Otrokovice and in accordance with applicable legislation. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:26, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Flood prevention measures by the city and Otrokovice Otrokovice |
Project in Czech Republic financed by DG Regio |
Statements
593,688.25 Czech koruna
0 references
698,456.77 Czech koruna
0 references
85.0 percent
0 references
27 March 2018
0 references
31 December 2019
0 references
město Otrokovice
0 references
76502
0 references
Projekt je zaměřen na vybudování preventivních protipovodňových opatření města a obce s rozšířenou působností Otrokovice spočívajících ve zpracování digitálního povodňového plánu města a správního obvodu obce s rozšířenou působností, vybudování lokálního a výstražného systému s cílem dosáhnout zkvalitnění a zlepšení systému povodňové hlásné služby v souladu se základními úkoly povodňového orgánu města a ORP Otrokovice a podle platné legislativy. (Czech)
0 references
The project is aimed at building preventive flood measures of the city and the municipality with extended scope of Otrokovice consisting of the processing of the digital flood plan of the city and the administrative district of the municipality with extended scope, the construction of a local and warning system with the aim of improving and improving the system of flood reporting services in accordance with the basic tasks of the city’s flood authority and Otrokovice and in accordance with applicable legislation. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/16_047/0004622
0 references