The development of a flood protection plan for the establishment of a flood warning and warning system for the municipality of the Region (Q59567): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project deals with the processing of the municipality of Ostrobothnia by the municipality of Ostrobothnia and the building of an alert and warning system by the municipality of Ostrobothnia. The development of a digital flood protection plan will be carried out through the assumption of preparatory measures against floods. The flood management plan is one of the sets of activities leading to possible reduction of the dire consequences in t...) |
(Created claim: summary (P836): The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the e...) |
||||||||||||||
Property / summary | |||||||||||||||
The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the establishment of a warning and warning system. (English) | |||||||||||||||
Property / summary: The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the establishment of a warning and warning system. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the establishment of a warning and warning system. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:21, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The development of a flood protection plan for the establishment of a flood warning and warning system for the municipality of the Region |
Project in Czech Republic financed by DG Regio |
Statements
2,072,499.31 Czech koruna
0 references
2,960,713.3 Czech koruna
0 references
70 percent
0 references
30 September 2020
0 references
Obec Ostroměř
0 references
50752
0 references
Projekt řeší zpracování dPP obce Ostroměř a vybudování varovného a výstražného systému obce Ostroměř. Zpracováním digitálního povodňového plánu bude splněn předpoklad přípravných opatření před povodněmi. Povodňový plán je jeden ze souborů činností vedoucích k možnému snížení hrozivých následků při povodních. Vybudováním varovného a výstražného systému bude zajištěno včasné varování obyvatelstva. (Czech)
0 references
The project deals with the preparation of the DPP of the municipality of Ostroměř and the construction of the warning and warning system of the municipality of Ostroměř. By processing the digital flood plan, the prerequisite for pre-flood preparatory measures will be met. A flood plan is one of the sets of activities leading to a possible reduction of the horrific consequences of flooding. Early warning to the population will be ensured by the establishment of a warning and warning system. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/19_124/0010075
0 references