The storm Buttholl Primary School (Q59534): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): At Buttlova Primary School, a rainwater system for rainwater collection will be established and their subsequent use for flushing the WC in the school’s building. The proposed solution contains a storage reservoir, filtration and a service set to connect to the distribution of sanitary water at the nursery site. Existing hot water from roofs on the nursery site will be connected to the rain economy. The accumulation of the storage tank shall b...)
(‎Created claim: summary (P836): Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rai...)
Property / summary
 
Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English)
Property / summary: Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English) / rank
 
Normal rank
Property / summary: Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English) / qualifier
 
point in time: 23 October 2020
Timestamp+2020-10-23T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:20, 23 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
The storm Buttholl Primary School
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    800,529.15 Czech koruna
    0 references
    32,021.17 Euro
    10 January 2020
    0 references
    941,799.0 Czech koruna
    0 references
    37,671.96 Euro
    10 January 2020
    0 references
    85 percent
    0 references
    15 September 2020
    0 references
    Město Chotěboř
    0 references
    0 references
    0 references

    49°43'35.04"N, 15°40'22.01"E
    0 references
    58301
    0 references
    V areálu ZŠ Buttulova v Chotěboři bude zřízeno dešťové hospodářství pro zadržování dešťových odpadních vod a jejich následné využití ke splachování WC v budově školy. Navrhované řešení obsahuje podzemní akumulační nádobu, filtraci a čerpací sadu pro napojení na rozvod užitkové vody v objektu ZŠ. Do dešťového hospodářství budou napojeny stávající dvorní svody ze střech v areálu ZŠ. Přepad z akumulační nádrže bude sveden do stávající dešťové kanalizační přípojky pro areál. (Czech)
    0 references
    Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/19_119/0010318
    0 references