The storm Buttholl Primary School (Q59534): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): At Buttlova Primary School, a rainwater system for rainwater collection will be established and their subsequent use for flushing the WC in the school’s building. The proposed solution contains a storage reservoir, filtration and a service set to connect to the distribution of sanitary water at the nursery site. Existing hot water from roofs on the nursery site will be connected to the rain economy. The accumulation of the storage tank shall b...) |
(Created claim: summary (P836): Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rai...) |
||||||||||||||
Property / summary | |||||||||||||||
Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English) | |||||||||||||||
Property / summary: Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English) / qualifier | |||||||||||||||
point in time: 23 October 2020
|
Revision as of 10:20, 23 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The storm Buttholl Primary School |
Project in Czech Republic financed by DG Regio |
Statements
800,529.15 Czech koruna
0 references
941,799.0 Czech koruna
0 references
85 percent
0 references
15 September 2020
0 references
Město Chotěboř
0 references
58301
0 references
V areálu ZŠ Buttulova v Chotěboři bude zřízeno dešťové hospodářství pro zadržování dešťových odpadních vod a jejich následné využití ke splachování WC v budově školy. Navrhované řešení obsahuje podzemní akumulační nádobu, filtraci a čerpací sadu pro napojení na rozvod užitkové vody v objektu ZŠ. Do dešťového hospodářství budou napojeny stávající dvorní svody ze střech v areálu ZŠ. Přepad z akumulační nádrže bude sveden do stávající dešťové kanalizační přípojky pro areál. (Czech)
0 references
Rain management for the retention of rainwater and their subsequent use for flushing toilets in the school building will be established in the area of Buttulova Primary School in Chotěboř. The proposed solution includes an underground storage vessel, filtration and pumping kit for connection to the distribution of utility water in the primary school building. Existing court sewers from the rooftops of primary schools will be connected to the rain economy. The overflow from the accumulation tank will be led to the existing rain sewer connection for the complex. (English)
23 October 2020
0 references
Identifiers
CZ.05.1.24/0.0/0.0/19_119/0010318
0 references