Upper Life -T401 Exchange with Compensation (Q19098): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The substation in Horni Zivotice is a key element of CP, which supplies the region of the Moravskoslezský Region. The project will exchange T401 250 MVA (which has reached its technical lifetime) for the new 350 MVA, including the power link and the monitoring system. The upgrade of the transformer station will be done and links to the management system, commercial measurements and protection will be ensured. This includes the creation of a ha...) |
(Created claim: summary (P836): Transformovna 400/110 kV Horní Životice is a key component of PS, which supplies the area of the Moravian-Silesian Region. As part of the project, the transformer T401 250 MVA (which reached its technical life) will be replaced with the new 350 MVA, incl. power interconnection and monitoring system. Modernisation of the transformer station will be carried out and connection to the control system, commercial measurement and protection will be ens...) |
||||||||||||||
Property / summary | |||||||||||||||
Transformovna 400/110 kV Horní Životice is a key component of PS, which supplies the area of the Moravian-Silesian Region. As part of the project, the transformer T401 250 MVA (which reached its technical life) will be replaced with the new 350 MVA, incl. power interconnection and monitoring system. Modernisation of the transformer station will be carried out and connection to the control system, commercial measurement and protection will be ensured. Part of this is the construction of a compensation plant and the connection of a new compensation choke. a. (English) | |||||||||||||||
Property / summary: Transformovna 400/110 kV Horní Životice is a key component of PS, which supplies the area of the Moravian-Silesian Region. As part of the project, the transformer T401 250 MVA (which reached its technical life) will be replaced with the new 350 MVA, incl. power interconnection and monitoring system. Modernisation of the transformer station will be carried out and connection to the control system, commercial measurement and protection will be ensured. Part of this is the construction of a compensation plant and the connection of a new compensation choke. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Transformovna 400/110 kV Horní Životice is a key component of PS, which supplies the area of the Moravian-Silesian Region. As part of the project, the transformer T401 250 MVA (which reached its technical life) will be replaced with the new 350 MVA, incl. power interconnection and monitoring system. Modernisation of the transformer station will be carried out and connection to the control system, commercial measurement and protection will be ensured. Part of this is the construction of a compensation plant and the connection of a new compensation choke. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 17:19, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Upper Life -T401 Exchange with Compensation |
Project in Czech Republic financed by DG Regio |
Statements
31,253,200.0 Czech koruna
0 references
78,133,000.0 Czech koruna
0 references
40 percent
0 references
11 January 2016
0 references
4 June 2018
0 references
30 June 2018
0 references
ČEPS, a.s.
0 references
10100
0 references
Transformovna 400/110 kV Horní Životice je klíčovým prvkem PS, který zásobuje oblast Moravskoslezského kraje. V rámci projektu dojde k výměně transformátoru T401 250 MVA (který dosáhl své technické životnosti) za nový 350 MVA, vč. silového propojení a monitorovacího systému. Bude provedena modernizace stanoviště transformátoru a bude zajištěno napojení na řídicí systém, obchodní měření a ochrany. Součástí je vybudování stanoviště kompenzačního zařízení a zapojení nové kompenzační tlumivky. a. (Czech)
0 references
Transformovna 400/110 kV Horní Životice is a key component of PS, which supplies the area of the Moravian-Silesian Region. As part of the project, the transformer T401 250 MVA (which reached its technical life) will be replaced with the new 350 MVA, incl. power interconnection and monitoring system. Modernisation of the transformer station will be carried out and connection to the control system, commercial measurement and protection will be ensured. Part of this is the construction of a compensation plant and the connection of a new compensation choke. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.43/0.0/0.0/15_027/0006086
0 references