Modernisation of Szt Karviná and Havířov – II. part (Q19051): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The reconstruction of the pipelines and the modernisation of the electrical and machinery parts of the transmission stations. The aim of the project is to reduce heat loss and self-consumption and to increase the reliability of the operation, by implementing the proposed measures on the SZT networks., remove_old_english_translation)
(‎Created claim: summary (P836): Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a., translated_summary)
Property / summary
 
Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a. (English)
Property / summary: Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a. (English) / rank
 
Normal rank
Property / summary: Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:19, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Modernisation of Szt Karviná and Havířov – II. part
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    22,350,634.4 Czech koruna
    0 references
    894,025.38 Euro
    10 January 2020
    0 references
    55,876,586.0 Czech koruna
    0 references
    2,235,063.44 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    15 February 2018
    0 references
    25 October 2020
    0 references
    Veolia Energie ČR, a.s.
    0 references

    49°50'27.60"N, 18°16'41.70"E
    0 references
    70200
    0 references
    Rekonstrukce potrubního rozvodu a modernizace elektro a strojní části předávacích stanic. Cílem projektu je snížení tepelných ztrát a vlastní spotřeby elektřiny a zvýšení spolehlivosti provozu, prostřednictvím realizace navržených opatření na sítích SZT. a. (Czech)
    0 references
    Reconstruction of pipeline distribution and modernisation of electrical and machine parts of transmission stations. The aim of the project is to reduce thermal losses and consumption of electricity and increase operation reliability through the implementation of proposed measures on SZT networks. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/16_064/0011868
    0 references