Production control – FORGGiO (Q19708): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the creation of a new software IT system based on the technologically obsolete solution. The solution is determined for line and combined series production, the management of entry-exit warehouses and intermediate stores, the weight of the material, EDI communication interface, ONLINE the monitoring of the quantity produced, automatic calculations of the capacity of lines and workstations, the automatic inclusion...)
(‎Created claim: summary (P836): The subject of the project is the creation of a new software information system based on the technically outdated Maggio solution. The solution is designed for line and combined series production, control of input of output warehouses and intermediate warehouses, load of material, EDI communication interface, ON-LINE monitoring of produced quantities, automatic calculations of lines and workplace capacities, automatic incorporation of production...)
Property / summary
 
The subject of the project is the creation of a new software information system based on the technically outdated Maggio solution. The solution is designed for line and combined series production, control of input of output warehouses and intermediate warehouses, load of material, EDI communication interface, ON-LINE monitoring of produced quantities, automatic calculations of lines and workplace capacities, automatic incorporation of production requirements, monitoring of data collisions and other functionalities. (English)
Property / summary: The subject of the project is the creation of a new software information system based on the technically outdated Maggio solution. The solution is designed for line and combined series production, control of input of output warehouses and intermediate warehouses, load of material, EDI communication interface, ON-LINE monitoring of produced quantities, automatic calculations of lines and workplace capacities, automatic incorporation of production requirements, monitoring of data collisions and other functionalities. (English) / rank
 
Normal rank
Property / summary: The subject of the project is the creation of a new software information system based on the technically outdated Maggio solution. The solution is designed for line and combined series production, control of input of output warehouses and intermediate warehouses, load of material, EDI communication interface, ON-LINE monitoring of produced quantities, automatic calculations of lines and workplace capacities, automatic incorporation of production requirements, monitoring of data collisions and other functionalities. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:12, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Production control – FORGGiO
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,481,397.2 Czech koruna
    0 references
    99,255.89 Euro
    10 January 2020
    0 references
    5,514,216.0 Czech koruna
    0 references
    220,568.64 Euro
    10 January 2020
    0 references
    45 percent
    0 references
    20 July 2018
    0 references
    28 February 2019
    0 references
    ECM System Solutions s.r.o.
    0 references
    0 references

    49°50'58.78"N, 17°45'54.68"E
    0 references
    74784
    0 references
    Předmětem projektu je tvorba nového softwarového informačního systému vycházejícího z technicky zastaralého řešení MAGGIO. Řešení je určeno pro liniovou a kombinovanou sériovou výrobu, řízení vstupně výstupních skladů a meziskladů, navážku materiálu, EDI komunikační rozhraní, ON-LINE sledování vyrobeného množství, automatické výpočty kapacit linek a pracovišť, automatické zapracování požadavků na výrobu, sledování kolizí dat dodaní a dalších funkcionalit. a. (Czech)
    0 references
    The subject of the project is the creation of a new software information system based on the technically outdated Maggio solution. The solution is designed for line and combined series production, control of input of output warehouses and intermediate warehouses, load of material, EDI communication interface, ON-LINE monitoring of produced quantities, automatic calculations of lines and workplace capacities, automatic incorporation of production requirements, monitoring of data collisions and other functionalities. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.4.04/0.0/0.0/16_076/0009574
    0 references