Construction of datacenter Rondel II spol. Vaudevile (Q19431): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at building a second RONDEL data centre, which will be more modern and technologically advanced than its predecessor, including infrastructure and support systems (drinking, cooling, ventilation, fire safety systems, etc.). The data capacities of the two centres will be spatially separated in a single object., remove_old_english_translation)
(‎Created claim: summary (P836): The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a., translated_summary)
Property / summary
 
The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a. (English)
Property / summary: The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a. (English) / rank
 
Normal rank
Property / summary: The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:02, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction of datacenter Rondel II spol. Vaudevile
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    0 references
    84,871,350.0 Czech koruna
    0 references
    3,394,854.0 Euro
    10 January 2020
    0 references
    188,603,000.0 Czech koruna
    0 references
    7,544,120.0 Euro
    10 January 2020
    0 references
    45 percent
    0 references
    24 June 2019
    0 references
    31 December 2018
    0 references
    Vaudevile, s.r.o.
    0 references
    0 references

    50°4'11.50"N, 14°22'51.56"E
    0 references

    50°4'6.46"N, 14°23'8.41"E
    0 references
    15000
    0 references
    Předmětem projektu je budování druhého datového centra RONDEL, které bude v porovnání se svým předchůdcem modernější a technologicky rozvinutější, vč. infrastruktury a podpůrných systémů (napájení, chlazení, ventilace, systémy požární bezpečnosti aj.). Datové kapacity obou center budou prostorově oddělené v rámci jednoho objektu. a. (Czech)
    0 references
    The object of the project is to build a second data centre Rondel, which will be more modern and technologically developed compared to its predecessor, including infrastructure and support systems (power, cooling, ventilation, fire safety systems, etc.). The data capacities of both centres will be spatially separated within one object. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.4.04/0.0/0.0/15_011/0003255
    0 references