Energy savings of Zámečnictví Němec, s.r.o. (Q16800): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at building a photovoltaic power plant with a full power output of 29, 7 kWp and a three-phase converter that ensures the production and supply of electricity to the grid. The FVE will be installed on the roof of the company’s locksmith’s office, German, s.r.o., which partially covers the current electricity consumption, thus reducing the energy intensity of the company. Surplus from EE production will be channelled into a pub...)
(‎Created claim: summary (P836): The project is focused on the construction of a photovoltaic power plant with a total output of 29, 7 kWp with the output to a three-phase converter, which ensures the production and supply of electricity to the network. FVE will be installed on the roof of the company Zámečnictví Němec, s.r.o., which will partially cover the current electricity consumption, thereby reducing the energy performance of the company. Surpluses from EE production wil...)
Property / summary
 
The project is focused on the construction of a photovoltaic power plant with a total output of 29, 7 kWp with the output to a three-phase converter, which ensures the production and supply of electricity to the network. FVE will be installed on the roof of the company Zámečnictví Němec, s.r.o., which will partially cover the current electricity consumption, thereby reducing the energy performance of the company. Surpluses from EE production will be channelled to the public distribution network. a. (English)
Property / summary: The project is focused on the construction of a photovoltaic power plant with a total output of 29, 7 kWp with the output to a three-phase converter, which ensures the production and supply of electricity to the network. FVE will be installed on the roof of the company Zámečnictví Němec, s.r.o., which will partially cover the current electricity consumption, thereby reducing the energy performance of the company. Surpluses from EE production will be channelled to the public distribution network. a. (English) / rank
 
Normal rank
Property / summary: The project is focused on the construction of a photovoltaic power plant with a total output of 29, 7 kWp with the output to a three-phase converter, which ensures the production and supply of electricity to the network. FVE will be installed on the roof of the company Zámečnictví Němec, s.r.o., which will partially cover the current electricity consumption, thereby reducing the energy performance of the company. Surpluses from EE production will be channelled to the public distribution network. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:51, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings of Zámečnictví Němec, s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    561,214.36 Czech koruna
    0 references
    22,448.57 Euro
    10 January 2020
    0 references
    701,517.96 Czech koruna
    0 references
    28,060.72 Euro
    10 January 2020
    0 references
    80.0 percent
    0 references
    31 December 2019
    0 references
    Zámečnictví Němec, s.r.o.
    0 references
    0 references

    49°17'13.49"N, 16°13'3.14"E
    0 references
    59501
    0 references
    Projekt je zaměřen na vybudování fotovoltaické elektrárny o celkovém výkonu 29, 7 kWp s vyvedeným výkonem do třífázového měniče, který zajišťuje výrobu a dodávku elektrické energie do sítě. FVE bude instalována na střeše provozovny společnosti Zámečnictví Němec, s.r.o., která částečně pokryje současnou spotřebu elektrické energie, čímž se sníží se energetická náročnost společnosti. Přebytky z výroby EE budou směrovány do veřejné distribuční sítě. a. (Czech)
    0 references
    The project is focused on the construction of a photovoltaic power plant with a total output of 29, 7 kWp with the output to a three-phase converter, which ensures the production and supply of electricity to the network. FVE will be installed on the roof of the company Zámečnictví Němec, s.r.o., which will partially cover the current electricity consumption, thereby reducing the energy performance of the company. Surpluses from EE production will be channelled to the public distribution network. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_178/0013750
    0 references