Building social housing in Branná (Q17296): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project aims at building new social housing blocks in the municipality for people in need of housing. The total reconstruction of the dilapidated object will give rise to a total of 8 housing units. The place of reconstruction has a clear link to civic facilities — this is not an exclusion or a segregated site. The project is implemented in the territory of a municipality with extended jurisdiction in which the socially excluded site is lo...)
(‎Created claim: summary (P836): The object of the project is to build new social apartments in Branná for those in need of housing. Thanks to the total reconstruction of the dilapidated building, a total of 8 residential units will be created. Instead of reconstruction it has a clear link to civic amenities – it is not an exclusion or segregated locality. The project is implemented in the territory of the municipality with extended scope, in which there is a socially excluded...)
Property / summary
 
The object of the project is to build new social apartments in Branná for those in need of housing. Thanks to the total reconstruction of the dilapidated building, a total of 8 residential units will be created. Instead of reconstruction it has a clear link to civic amenities – it is not an exclusion or segregated locality. The project is implemented in the territory of the municipality with extended scope, in which there is a socially excluded locality (ORP Šumperk). a. (English)
Property / summary: The object of the project is to build new social apartments in Branná for those in need of housing. Thanks to the total reconstruction of the dilapidated building, a total of 8 residential units will be created. Instead of reconstruction it has a clear link to civic amenities – it is not an exclusion or segregated locality. The project is implemented in the territory of the municipality with extended scope, in which there is a socially excluded locality (ORP Šumperk). a. (English) / rank
 
Normal rank
Property / summary: The object of the project is to build new social apartments in Branná for those in need of housing. Thanks to the total reconstruction of the dilapidated building, a total of 8 residential units will be created. Instead of reconstruction it has a clear link to civic amenities – it is not an exclusion or segregated locality. The project is implemented in the territory of the municipality with extended scope, in which there is a socially excluded locality (ORP Šumperk). a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:51, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Building social housing in Branná
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    8,760,971.25 Czech koruna
    0 references
    350,438.85 Euro
    1 October 2020
    0 references
    10,307,025.0 Czech koruna
    0 references
    412,281.0 Euro
    1 October 2020
    0 references
    85 percent
    0 references
    2 May 2016
    0 references
    25 March 2019
    0 references
    31 March 2019
    0 references
    SB Marketing, z.s.
    0 references
    0 references

    50°10'25.7"N, 17°1'51.2"E
    0 references
    78825
    0 references
    Předmětem projektu je vybudovat v obci Branná nové sociální byty pro osoby, které se nacházejí v bytové nouzi. Díky celkové rekonstrukci zchátralého objektu vznikne celkem 8 bytových jednotek. Místo rekonstrukce má jasnou vazbou na občanskou vybavenost - nejedná se tedy o vyloučení či segregovanou lokalitu. Projekt je realizován na území obce s rozšířenou působností, ve kterém se nachází sociálně vyloučená lokalita (ORP Šumperk). a. (Czech)
    0 references
    The object of the project is to build new social apartments in Branná for those in need of housing. Thanks to the total reconstruction of the dilapidated building, a total of 8 residential units will be created. Instead of reconstruction it has a clear link to civic amenities – it is not an exclusion or segregated locality. The project is implemented in the territory of the municipality with extended scope, in which there is a socially excluded locality (ORP Šumperk). a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.06.2.56/0.0/0.0/16_033/0003014
    0 references