Implementation of measures to improve reliability, awareness and implementation of the balance and optimisation of operation in the ENERGO KD local distribution system (Q18632): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will implement the whole complex of the smart grid implementation measures in the local energy-producing local distribution system. The main areas of implementation are the creation of a new data balancing centre based on a smart metering system with the addition of a number of other technological functionalities. The second major area is the modernisation of the control and the operational management of the system, which is comple...) |
(Created claim: summary (P836): Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new...) |
||||||||||||||
Property / summary | |||||||||||||||
Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new remote controlled switching and monitoring elements. a. (English) | |||||||||||||||
Property / summary: Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new remote controlled switching and monitoring elements. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new remote controlled switching and monitoring elements. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:49, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of measures to improve reliability, awareness and implementation of the balance and optimisation of operation in the ENERGO KD local distribution system |
Project in Czech Republic financed by DG Regio |
Statements
4,178,851.44 Czech koruna
0 references
10,447,128.6 Czech koruna
0 references
40 percent
0 references
30 September 2017
0 references
15 June 2021
0 references
ENERGO KD s.r.o.
0 references
26701
0 references
V rámci projektu bude implementován celý komplex opatření implementace inteligentních prvků v lokální distribuční soustavě ENERGO KD. Hlavními oblastmi implementace jsou vybudování nového datového bilančního centra navázaného na inteligentní systém měření s doplněním o mnoho dalších technologických funkcionalit. Druhou významnou oblastí je modernizace dispečerského a operativního řízení soustavy, které je doplněno o nové dálkově řízené spínací a monitorovací prvky. a. (Czech)
0 references
Within the project, the entire complex of measures to implement intelligent elements in the local ENERGO KD distribution system will be implemented. The main areas of implementation are the construction of a new data balance centre linked to an intelligent measuring system, supplementing many other technological functionalities. The second important area is modernisation of dispatch and operational system management, which is complemented by new remote controlled switching and monitoring elements. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.12/0.0/0.0/16_062/0011432
0 references