Energy optimisation of the production process in PYROTEK CZ, s.r.o. (Q18625): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The main objective of the project is to reduce the energy performance of the production operations of Pyrotek CZ, s.r.o.. The purpose of the project is to upgrade the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise combustion and tensile ratios of the tunnel furnace and, by extension, to refine the management of the heating system., remove_old_english_translation)
(‎Created claim: summary (P836): The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a., translated_summary)
Property / summary
 
The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a. (English)
Property / summary: The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a. (English) / rank
 
Normal rank
Property / summary: The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:49, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy optimisation of the production process in PYROTEK CZ, s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,901,999.99 Czech koruna
    0 references
    76,080.00 Euro
    10 January 2020
    0 references
    6,155,000.0 Czech koruna
    0 references
    246,200.0 Euro
    10 January 2020
    0 references
    30.9 percent
    0 references
    31 December 2019
    0 references
    PYROTEK CZ, s.r.o.
    0 references
    0 references

    49°21'47.20"N, 16°39'12.74"E
    0 references
    67801
    0 references
    Hlavním cílem projektu je snížení energetické náročnosti ve výrobním provozu společnosti PYROTEK CZ, s.r.o.. Předmětem projektu je modernizace stávající tunelové pece Technochemica TSX/42/1500 s cílem optimalizovat spalovací a tahové poměry tunelové pece a potažmo zpřesnit řízení topného systému. a. (Czech)
    0 references
    The main objective of the project is to reduce energy performance in the production operation of PYROTEK CZ, s.r.o.. The object of the project is the modernisation of the existing tunnel furnace Technochemica TSX/42/1500 in order to optimise the combustion and thrust ratios of the tunnel kiln and therefore to refine the control of the heating system. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/18_183/0017729
    0 references