HFVE De-Wood a.s., Uničov (Q16643): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project concerns the installation of a photovoltaic system with a installed capacity of 446,31 kWp, i.e. with an energy storage capacity and a storage capacity of 203.55 kWh. A contract for the connection of generation and off-take of electricity in the distribution system with the distribution system operator of ČEZ Distribuce, a.s. is a contract for the connection of generation and off-take of electricity from the grid system of ČEZ Dist...) |
(Created claim: summary (P836): The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage level of high voltage no. 17_VN_1008402809 with the operator of the distribution system ČEZ Distribuce, a.s. a. (English) | |||||||||||||||
Property / summary: The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage level of high voltage no. 17_VN_1008402809 with the operator of the distribution system ČEZ Distribuce, a.s. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage level of high voltage no. 17_VN_1008402809 with the operator of the distribution system ČEZ Distribuce, a.s. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:44, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | HFVE De-Wood a.s., Uničov |
Project in Czech Republic financed by DG Regio |
Statements
11,488,996.42 Czech koruna
0 references
16,412,852.03 Czech koruna
0 references
70.0 percent
0 references
15 October 2020
0 references
De-Wood a.s.
0 references
78391
0 references
Předmětem projektu je instalace fotovoltaického systému o instalovaném výkonu 446,31 kWp tj. s akumulací energie a kapacitou akumulace 203,55 kWh. Panely budou v sériově-paralelním zapojení na střechách stávajících průmyslových objektů v areálu společnosti.Společnost De-Wood a.s. má uzavřenou smlouvu o připojení zařízení pro výrobu a odběr elektřiny v distribuční soustavě z napěťové hladiny vysokého napětí č. 17_VN_1008402809 s provozovatelem distribuční soustavy ČEZ Distribuce, a.s. a. (Czech)
0 references
The object of the project is the installation of a photovoltaic system with installed output of 446.31 kWp, i.e. with energy storage capacity and 203.55 kWh accumulation capacity. The panels will be in series-parallel connection on the roofs of existing industrial buildings on the company premises.De-Wood a.s. has a contract for connection of equipment for the production and consumption of electricity in the distribution system from the voltage level of high voltage no. 17_VN_1008402809 with the operator of the distribution system ČEZ Distribuce, a.s. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_138/0011631
0 references