Introduction of automation at the Material Separation Centre of HESTEGO a.s. (Q16165): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The aim of the project is to increase the energy efficiency of the manufacturing process of metallic materials through automation of the division of materials where the process takes place. This is a comprehensive increase in efficiency in the process of removing and storing the sheets. As part of the project, the device is replaced by a fully automated storage and sorbing system that ensures a 27.80 % reduction in the energy intensity of the...) |
(Created claim: summary (P836): The essence of the project is to increase the energy efficiency of the production process of the handling and processing of metal material through automation of the material cutting workplace where this process takes place. This is a complex increase in the efficiency of the process of machining and storage of sheet metals. Within the project, the equipment will be replaced by the handling and machining of sheet metal parts by a fully automated...) |
||||||||||||||
Property / summary | |||||||||||||||
The essence of the project is to increase the energy efficiency of the production process of the handling and processing of metal material through automation of the material cutting workplace where this process takes place. This is a complex increase in the efficiency of the process of machining and storage of sheet metals. Within the project, the equipment will be replaced by the handling and machining of sheet metal parts by a fully automated storage and sorting system that ensures that the energy performance of the process is reduced by 27.80 %. a. (English) | |||||||||||||||
Property / summary: The essence of the project is to increase the energy efficiency of the production process of the handling and processing of metal material through automation of the material cutting workplace where this process takes place. This is a complex increase in the efficiency of the process of machining and storage of sheet metals. Within the project, the equipment will be replaced by the handling and machining of sheet metal parts by a fully automated storage and sorting system that ensures that the energy performance of the process is reduced by 27.80 %. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The essence of the project is to increase the energy efficiency of the production process of the handling and processing of metal material through automation of the material cutting workplace where this process takes place. This is a complex increase in the efficiency of the process of machining and storage of sheet metals. Within the project, the equipment will be replaced by the handling and machining of sheet metal parts by a fully automated storage and sorting system that ensures that the energy performance of the process is reduced by 27.80 %. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:40, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Introduction of automation at the Material Separation Centre of HESTEGO a.s. |
Project in Czech Republic financed by DG Regio |
Statements
10,393,770.75 Czech koruna
0 references
34,645,902.51 Czech koruna
0 references
30.0 percent
0 references
20 February 2018
0 references
18 December 2018
0 references
28 February 2019
0 references
HESTEGO a.s.
0 references
68201
0 references
Podstatou projektu je zvýšit energetickou účinnost výrobního procesu manipulace a opracování kovového materiálu prostřednictvím automatizace pracoviště dělení materiálu, kde tento proces probíhá. Jedná se o komplexní zvýšení efektivity procesu obrábění a skladování plechů. V rámci projektu dojde k nahrazení zařízení k manipulaci a obrábění plechových dílů plně automatizovaným skladovacím a sortovacím systémem, který zajistí snížení energetické náročnosti procesu o 27,80 %. a. (Czech)
0 references
The essence of the project is to increase the energy efficiency of the production process of the handling and processing of metal material through automation of the material cutting workplace where this process takes place. This is a complex increase in the efficiency of the process of machining and storage of sheet metals. Within the project, the equipment will be replaced by the handling and machining of sheet metal parts by a fully automated storage and sorting system that ensures that the energy performance of the process is reduced by 27.80 %. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0012929
0 references