Energy savings of the object Poliklinika Sokolov, Rokycanova 1756, Sokolov (Q16146): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The subject of the project is the implementation of savings measures leading to a reduction in the energy intensity of the medical line, Sokolov, street in Rokycanova 1756. The project will lead to the insulation of the perimeter masonry, roof structures and floors and, at the same time, filling the gaps in outstanding windows. In the course of the considered maintenance, the heating system is modified., remove_old_english_translation)
(‎Created claim: summary (P836): The object of the project is to implement savings measures leading to the reduction of the energy performance of the health facility – Polklinika v Sokolov, in Rokycanova street 1756. Through the project will be insulated circumferential masonry, roof structures and floors and at the same time the filling of holes at the windows not yet replaced will be replaced. The heating system will be modified as part of the maintenance considered. a., tran...)
Property / summary
 
The object of the project is to implement savings measures leading to the reduction of the energy performance of the health facility – Polklinika v Sokolov, in Rokycanova street 1756. Through the project will be insulated circumferential masonry, roof structures and floors and at the same time the filling of holes at the windows not yet replaced will be replaced. The heating system will be modified as part of the maintenance considered. a. (English)
Property / summary: The object of the project is to implement savings measures leading to the reduction of the energy performance of the health facility – Polklinika v Sokolov, in Rokycanova street 1756. Through the project will be insulated circumferential masonry, roof structures and floors and at the same time the filling of holes at the windows not yet replaced will be replaced. The heating system will be modified as part of the maintenance considered. a. (English) / rank
 
Normal rank
Property / summary: The object of the project is to implement savings measures leading to the reduction of the energy performance of the health facility – Polklinika v Sokolov, in Rokycanova street 1756. Through the project will be insulated circumferential masonry, roof structures and floors and at the same time the filling of holes at the windows not yet replaced will be replaced. The heating system will be modified as part of the maintenance considered. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:39, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings of the object Poliklinika Sokolov, Rokycanova 1756, Sokolov
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,454,065.2 Czech koruna
    0 references
    298,162.61 Euro
    10 January 2020
    0 references
    18,635,163.0 Czech koruna
    0 references
    745,406.52 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    31 December 2020
    0 references
    Léčebně preventivní zařízení s. r. o.
    0 references
    0 references

    50°10'30.50"N, 12°39'7.88"E
    0 references
    35601
    0 references
    Předmětem projektu je realizace úsporných opatření vedoucích ke snížení energetické náročnosti zdravotnického objektu - poliklinika v Sokolově, v ulici Rokycanova 1756. Prostřednictvím projektu dojde k zateplení obvodového zdiva, střešních konstrukcí a podlah a zároveň dojde k výměně výplní otvorů u dosud nevyměněných oken. V rámci uvažované údržby dojde k úpravě otopného systému. a. (Czech)
    0 references
    The object of the project is to implement savings measures leading to the reduction of the energy performance of the health facility – Polklinika v Sokolov, in Rokycanova street 1756. Through the project will be insulated circumferential masonry, roof structures and floors and at the same time the filling of holes at the windows not yet replaced will be replaced. The heating system will be modified as part of the maintenance considered. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_101/0012820
    0 references