Construction of biomass heating plant by LESS & ENERGY s.r.o. in Long Vsi (Q15341): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project will build a boiler and installation of a boiler with a heat output of 800 kW. The raw material for this boiler will be waste brown chips from the process of debarking the wood company, LESS & Timer, a.s., which will at the same time be a purchaser of the produced heat. The implementation of the project will lead to a significant reduction of harmful emissions in the air., remove_old_english_translation) |
(Created claim: summary (P836): As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a. (English) | |||||||||||||||
Property / summary: As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:36, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of biomass heating plant by LESS & ENERGY s.r.o. in Long Vsi |
Project in Czech Republic financed by DG Regio |
Statements
7,810,492.08 Czech koruna
0 references
13,017,486.8 Czech koruna
0 references
60 percent
0 references
21 April 2017
0 references
25 April 2018
0 references
30 April 2018
0 references
LESS & ENERGY s.r.o.
0 references
28601
0 references
V rámci projektu dojde k výstavbě kotelny a instalaci kotle o tepelném výkonu 800 kW. Jako surovina pro tento kotel bude sloužit odpadní hnědá štěpka z procesu odkornění dřevozpracujícího podniku LESS & TIMBER, a.s., který bude zároveň odběratelem vyrobeného tepla. Realizací projektu dojde k výraznému omezení škodlivých emisí do ovzduší. a. (Czech)
0 references
As part of the project, the boiler room will be built and a boiler with a heat output of 800 kW will be installed. The raw material for this boiler will be a waste brown chip from the debarking process of the woodworking company LESS & TIMBER, a.s., which will also be a customer of the heat produced. Implementation of the project will significantly reduce harmful emissions into the air. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.09/0.0/0.0/16_130/0009806
0 references