RECOVERY OF WASTE HEAT FROM THE COGENERATION UNIT BPS MARŠOV I. AND II. STAGE (Q15333): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Heat recovery from an existing power generating plant — a biogas plant located in the municipality of Malšice, part of the municipality of Maršov. Waste heat shall be intended for distribution to the place of consumption, that is to say, to the connected objects. a, remove_old_english_translation)
(‎Created claim: summary (P836): Transfer of heat from the existing electricity and heat plant – biogas station located in the village of Malšice, part of the municipality of Maršov. Waste heat will be determined for distribution to the place of consumption, i.e. to connected objects. a., translated_summary)
Property / summary
 
Transfer of heat from the existing electricity and heat plant – biogas station located in the village of Malšice, part of the municipality of Maršov. Waste heat will be determined for distribution to the place of consumption, i.e. to connected objects. a. (English)
Property / summary: Transfer of heat from the existing electricity and heat plant – biogas station located in the village of Malšice, part of the municipality of Maršov. Waste heat will be determined for distribution to the place of consumption, i.e. to connected objects. a. (English) / rank
 
Normal rank
Property / summary: Transfer of heat from the existing electricity and heat plant – biogas station located in the village of Malšice, part of the municipality of Maršov. Waste heat will be determined for distribution to the place of consumption, i.e. to connected objects. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:36, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
RECOVERY OF WASTE HEAT FROM THE COGENERATION UNIT BPS MARŠOV I. AND II. STAGE
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,498,802.5 Czech koruna
    0 references
    99,952.1 Euro
    10 January 2020
    0 references
    4,997,605.0 Czech koruna
    0 references
    199,904.2 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    31 March 2019
    0 references
    Miloslav Drhovský
    0 references
    0 references

    49°21'32.22"N, 14°34'42.64"E
    0 references
    39175
    0 references
    Vyvedení tepla ze stávající výrobny elektřiny a tepla - bioplynové stanice, která se nachází v obci Malšice, část obce Maršov. Odpadní teplo bude určeno pro distribuci do místa spotřeby, tedy do napojených objektů. a. (Czech)
    0 references
    Transfer of heat from the existing electricity and heat plant – biogas station located in the village of Malšice, part of the municipality of Maršov. Waste heat will be determined for distribution to the place of consumption, i.e. to connected objects. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/15_024/0007126
    0 references