Impexta ČRO, s.r.o. – Energy savings (Q16398): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The object of the project is the construction of a house used by Impexta ČRo, s.r.o. for its activities. The existing structure will be wound up, a part of the selector will be replaced and the hot roof will be warm. The implementation of the project will lead to a saving of energy of 263,5 GJ, representing a saving of 25 % compared to the current situation. This will lead to a reduction in operating costs of CZK 95 555. The project will also...) |
(Created claim: summary (P836): The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. Th...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. The implementation of the project will also reduce CO2 emissions by 19.149 t/year. (English) | |||||||||||||||
Property / summary: The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. The implementation of the project will also reduce CO2 emissions by 19.149 t/year. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. The implementation of the project will also reduce CO2 emissions by 19.149 t/year. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:34, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Impexta ČRO, s.r.o. – Energy savings |
Project in Czech Republic financed by DG Regio |
Statements
1,075,000.0 Czech koruna
0 references
2,150,000.0 Czech koruna
0 references
50 percent
0 references
30 November 2020
0 references
IMPEXTA ČRO s. r. o.
0 references
10400
0 references
Předmětem projektu jsou stavební úpravy haly, kterou pro svou činnost využívá společnost Impexta ČRO, s.r.o.. Stávající objekt bude zateplen, bude vyměněna část otvorových výplní, rovněž dojde k zateplení střechy. Realizací projektu se docílí úspory energie ve výši 263,5 GJ, což představuje úsporu 25 % oproti stávajícímu stavu. Díky tomu dojde ke snížení provozních nákladů o 95 555 Kč. Realizací projektu rovněž dojde ke snížení emisí CO2, a to o 19,149 t/rok. a. (Czech)
0 references
The object of the project is building modifications of the hall, which is used for its activities by Impexta ČRO, s.r.o.. The existing building will be insulated, some of the hole fillings will be replaced, the roof will also be insulated. By implementing the project, energy savings of 263.5 GJ will be achieved, which represents a 25 % savings compared to the current situation. This will result in a reduction in operating costs by CZK 95,555. The implementation of the project will also reduce CO2 emissions by 19.149 t/year. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/17_101/0013666
0 references