Energy saving measures at Granit Zedníček s.r.o. (Q16044): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project concerns the realisation of investments consisting of the insulation of facades of the facades of Granit’s building site, where social facilities and workshops and the insulation of the façade of the premises of the production hall are located. In addition, heating will be reconstructed which will be provided by 3 air-to-air water pumps. As a result, an existing format saw will be exchanged for a less energy-intensive format. These...)
(‎Created claim: summary (P836): The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formattin...)
Property / summary
 
The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formatting saw. These energy-saving measures will reduce the energy performance of buildings and production machinery. a. (English)
Property / summary: The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formatting saw. These energy-saving measures will reduce the energy performance of buildings and production machinery. a. (English) / rank
 
Normal rank
Property / summary: The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formatting saw. These energy-saving measures will reduce the energy performance of buildings and production machinery. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:22, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy saving measures at Granit Zedníček s.r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,621,169.76 Czech koruna
    0 references
    104,846.79 Euro
    10 January 2020
    0 references
    5,242,339.52 Czech koruna
    0 references
    209,693.58 Euro
    10 January 2020
    0 references
    50 percent
    0 references
    31 December 2019
    0 references
    Granit Zedníček s.r.o.
    0 references
    0 references

    49°15'46.37"N, 16°1'5.23"E
    0 references
    67503
    0 references
    Předmětem projektu je realizace investic spočívajících v zateplení fasády stavebního objektu firmy Granit Zedníček s.r.o., kde se nachází sociální zázemí a dílny a zateplení fasády objektu výrobní haly. Dále bude rekonstruováno vytápění, které bude zajištěno 3 tepelnými čerpadly vzduch-voda. Následně bude vyměněna stávající formátovací pila za méně energeticky náročnou formátovací pilu. Tato energeticky úsporná opatření povedou ke snížení energetické náročnosti budov a výrobních strojů. a. (Czech)
    0 references
    The object of the project is the realisation of investments consisting of insulation of the facade of the building building Granit Zedníček s.r.o., where there are social facilities and workshops and insulation of the façade of the production hall building. In addition, heating will be reconstructed, which will be provided by 3 air-water heat pumps. Subsequently, the existing formatting saw will be replaced with a less energy-intensive formatting saw. These energy-saving measures will reduce the energy performance of buildings and production machinery. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011936