Optimisation of the waste water pumping station in Ponětovice (Q16030): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Ms Podetovice, during a relatively significant period of time, benefits from an inefficient incoming waste water from a total of 17 municipalities in the agglomeration of Šlapandico. In exchange of 3 driven power pumps (instead of the current 1 small and two large performers), the implementation of an effective system of measurement, regulation and management of drawdowns, including the modification of the installation chamber of the MS, would...)
(‎Created claim: summary (P836): Čs Ponětovice draws inefficiently inefficiently influencing waste water from a total of 17 municipalities of the Šlapanicko agglomeration in a relatively significant period of time. In exchange of 3 power-controlled pumps (instead of the existing 1 small and two pumps with high performance), the implementation of an effective system of measurement, regulation and pumping control, including construction modification of the inflow chamber ČS will...)
Property / summary
 
Čs Ponětovice draws inefficiently inefficiently influencing waste water from a total of 17 municipalities of the Šlapanicko agglomeration in a relatively significant period of time. In exchange of 3 power-controlled pumps (instead of the existing 1 small and two pumps with high performance), the implementation of an effective system of measurement, regulation and pumping control, including construction modification of the inflow chamber ČS will make the operation of ČS significantly more efficient, especially in terms of electricity consumption. Savings of up to 92000 kWh per year are expected. a. (English)
Property / summary: Čs Ponětovice draws inefficiently inefficiently influencing waste water from a total of 17 municipalities of the Šlapanicko agglomeration in a relatively significant period of time. In exchange of 3 power-controlled pumps (instead of the existing 1 small and two pumps with high performance), the implementation of an effective system of measurement, regulation and pumping control, including construction modification of the inflow chamber ČS will make the operation of ČS significantly more efficient, especially in terms of electricity consumption. Savings of up to 92000 kWh per year are expected. a. (English) / rank
 
Normal rank
Property / summary: Čs Ponětovice draws inefficiently inefficiently influencing waste water from a total of 17 municipalities of the Šlapanicko agglomeration in a relatively significant period of time. In exchange of 3 power-controlled pumps (instead of the existing 1 small and two pumps with high performance), the implementation of an effective system of measurement, regulation and pumping control, including construction modification of the inflow chamber ČS will make the operation of ČS significantly more efficient, especially in terms of electricity consumption. Savings of up to 92000 kWh per year are expected. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:22, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Optimisation of the waste water pumping station in Ponětovice
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,671,574.91 Czech koruna
    0 references
    66,863.00 Euro
    10 January 2020
    0 references
    5,571,916.38 Czech koruna
    0 references
    222,876.66 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    27 October 2020
    0 references
    VODÁRENSKÁ AKCIOVÁ SPOLEČNOST, a.s.
    0 references

    49°13'41.81"N, 16°37'32.74"E
    0 references
    63800
    0 references
    ČS Ponětovice v relativně významné ročním časovém období čerpá neefektivně přitékající odpadní vody z celkem 17 obcí aglomerace Šlapanicko. Výměnou 3 čerpadel řízeného výkonu (místo stávajících 1 malému a dvěma čerpadlům s velkými výkony), realizací efektivního systému měření, regulace a řízení čerpání, včetně stavební úpravy nátokové komory ČS dojde k významnémun zefektivnění provozu ČS, a to zejména z hlediska spotřeby elektrické energie. Očekává se úspora až 92 000 kWh za rok. a. (Czech)
    0 references
    Čs Ponětovice draws inefficiently inefficiently influencing waste water from a total of 17 municipalities of the Šlapanicko agglomeration in a relatively significant period of time. In exchange of 3 power-controlled pumps (instead of the existing 1 small and two pumps with high performance), the implementation of an effective system of measurement, regulation and pumping control, including construction modification of the inflow chamber ČS will make the operation of ČS significantly more efficient, especially in terms of electricity consumption. Savings of up to 92000 kWh per year are expected. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011897
    0 references