Energy-saving measures of the Hydroproduct complex (Q16009): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The purpose of the project is the implementation of three technical measures to achieve the final energy savings of the company’s production site. these activities: (1) the insulation of the perimeter wall (2) the replacement of existing lighting at the cost-saving LED lamp (3) is the replacement of existing gas boilers and of a new condensing gas pen., remove_old_english_translation) |
(Created claim: summary (P836): The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a. (English) | |||||||||||||||
Property / summary: The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:19, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy-saving measures of the Hydroproduct complex |
Project in Czech Republic financed by DG Regio |
Statements
2,362,121.25 Czech koruna
0 references
5,905,303.0 Czech koruna
0 references
40 percent
0 references
31 October 2019
0 references
HYDROPRODUCT s.r.o.
0 references
29001
0 references
Předmětem projektu je realizace tří stavebně technických opatření pro dosažení úspory konečné spotřeby energie ve výrobním areálu společnosti.Jedná se o tyto aktivity:1) zateplení obvodových stěn2) výměna stávajícího osvětlení za úsporná LED svítila3) výměna stávajících plynových kotlů a nové kondenzační plynové kotle. a. (Czech)
0 references
The object of the project is the implementation of three construction technical measures to achieve savings of final energy consumption in the company’s production area.These activities are:1) insulation of perimeter walls2) replacement of existing lighting for economical LED lamp3) replacement of existing gas boilers and new condensation gas boilers. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/16_061/0011850
0 references