Energy savings within the framework of the reconstruction of the operating building of CEPS, a.s. (Q15878): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project focuses on the insulation of the building and the reconstruction of the heating system as well as the preparation of the TUV at CEPS a.s. in CEPS, which is being used in the long term as an operational building. The condition of the object does not correspond to the current requirements of ensuring a good quality environment for employees of the firm, while energy consumption is disproportionately high. The implementation of the pr...)
(‎Created claim: summary (P836): The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of t...)
Property / summary
 
The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of the submitted project will save energy consumption for heating and electricity on the operation of the building. a. (English)
Property / summary: The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of the submitted project will save energy consumption for heating and electricity on the operation of the building. a. (English) / rank
 
Normal rank
Property / summary: The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of the submitted project will save energy consumption for heating and electricity on the operation of the building. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:18, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings within the framework of the reconstruction of the operating building of CEPS, a.s.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    2,388,818.5 Czech koruna
    0 references
    95,552.74 Euro
    10 January 2020
    0 references
    4,777,637.11 Czech koruna
    0 references
    191,105.48 Euro
    10 January 2020
    0 references
    50.0 percent
    0 references
    30 April 2020
    0 references
    CEPS a.s.
    0 references
    0 references

    49°58'5.20"N, 14°32'56.36"E
    0 references

    49°58'14.12"N, 14°31'52.07"E
    0 references
    25242
    0 references
    Projekt je zaměřen na zateplení objektu a rekonstrukci systému vytápění i přípravy TUV v provozní budově technické základny společnosti CEPS a.s. v Cítolibech, která je dlouhodobě využívána jako provozní budova. Stav objektu neodpovídá stávajícím požadavkům na zajištění kvalitního prostředí pro zaměstnance firmy, zároveň spotřeba energií je neúměrně vysoká. Realizace předkládaného projektu přinese úsporu spotřeby energie na vytápění a elektrické energie na chod objektu. a. (Czech)
    0 references
    The project is focused on insulation of the building and reconstruction of the heating system and preparation of TUV in the operating building of the technical base of CEPS a.s. in Cítoliby, which is used as an operational building for a long time. The state of the building does not meet the existing requirements for ensuring a quality environment for employees of the company, while energy consumption is disproportionately high. Realisation of the submitted project will save energy consumption for heating and electricity on the operation of the building. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/16_061/0011008
    0 references