Energy savings Prefa Brno a.s., Hodonín plant (Q15458): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved., remove_old_english_translation)
(‎Created claim: summary (P836): The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a., translated_summary)
Property / summary
 
The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English)
Property / summary: The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English) / rank
 
Normal rank
Property / summary: The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English) / qualifier
 
point in time: 22 October 2020
Timestamp+2020-10-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:01, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Energy savings Prefa Brno a.s., Hodonín plant
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    875,102.54 Czech koruna
    0 references
    35,004.10 Euro
    10 January 2020
    0 references
    2,917,008.47 Czech koruna
    0 references
    116,680.34 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    1 December 2015
    0 references
    28 December 2017
    0 references
    31 December 2017
    0 references
    Prefa Brno a.s.
    0 references
    0 references

    49°11'55.75"N, 16°38'29.22"E
    0 references
    61500
    0 references
    V rámci projektu dojde k realizaci tepelně technických opatření a tím k významnému snížení energetické náročnosti administrativního objektu společnosti. Dojde k realizaci zejména zateplení pláště budovy, rekonstrukci rozvodů, instalace fotovoltaiky a osvětlení, vše v souladu s energetickým auditem. a. (Czech)
    0 references
    The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English)
    22 October 2020