(Removed claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved., remove_old_english_translation) |
(Created claim: summary (P836): The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a., translated_summary) |
||||||||||||||
Property / summary | |||||||||||||||
The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English) | |||||||||||||||
Property / summary: The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English) / qualifier | |||||||||||||||
point in time: 22 October 2020
|
Revision as of 16:01, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings Prefa Brno a.s., Hodonín plant |
Project in Czech Republic financed by DG Regio |
Statements
875,102.54 Czech koruna
0 references
2,917,008.47 Czech koruna
0 references
30.0 percent
0 references
1 December 2015
0 references
28 December 2017
0 references
31 December 2017
0 references
Prefa Brno a.s.
0 references
61500
0 references
V rámci projektu dojde k realizaci tepelně technických opatření a tím k významnému snížení energetické náročnosti administrativního objektu společnosti. Dojde k realizaci zejména zateplení pláště budovy, rekonstrukci rozvodů, instalace fotovoltaiky a osvětlení, vše v souladu s energetickým auditem. a. (Czech)
0 references
The project will implement thermally technical measures and thus significantly reduce the energy performance of the company’s administrative structure. There will be implementation especially insulation of the building casing, reconstruction of distributions, installation of photovoltaics and lighting, all in accordance with the energy audit. a. (English)
22 October 2020
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0001005
0 references