Energy savings Prefa Brno a.s., Hodonín plant (Q15458): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: translated_label) |
(Removed claim: summary (P836): The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved., remove_old_english_translation) |
||
Property / summary | |||
Property / summary: The project will lead to the implementation of thermal technological measures and thus a significant reduction in the energy intensity of the company’s administrative object. In particular, the insulation of the building envelope, the reconstruction of the wiring, the installation of the photovoltaics (PV) and the lighting system, all in line with energy output will be achieved. (English) / rank | |||
Revision as of 16:01, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy savings Prefa Brno a.s., Hodonín plant |
Project in Czech Republic financed by DG Regio |
Statements
875,102.54 Czech koruna
0 references
2,917,008.47 Czech koruna
0 references
30.0 percent
0 references
1 December 2015
0 references
28 December 2017
0 references
31 December 2017
0 references
Prefa Brno a.s.
0 references
61500
0 references
V rámci projektu dojde k realizaci tepelně technických opatření a tím k významnému snížení energetické náročnosti administrativního objektu společnosti. Dojde k realizaci zejména zateplení pláště budovy, rekonstrukci rozvodů, instalace fotovoltaiky a osvětlení, vše v souladu s energetickým auditem. a. (Czech)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0001005
0 references