Implementation of energy saving measures in the production plant of NOVASERVIS spol. s r.o. (Q15414): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Implementation of energy saving measures in the production plant of NOVASERVIS spol. s r.o. |
Revision as of 07:57, 22 October 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Implementation of energy saving measures in the production plant of NOVASERVIS spol. s r.o. |
Project in Czech Republic financed by DG Regio |
Statements
3,057,000.0 Czech koruna
0 references
10,190,000.0 Czech koruna
0 references
30 percent
0 references
23 September 2015
0 references
18 December 2017
0 references
31 December 2017
0 references
NOVASERVIS spol. s r.o.
0 references
61300
0 references
Předmětem projektu je realizace úsporných opatření ve formě změny zdrojů tepla (výměna plynových kotlů v kotelně, výměna plynových zářičů), zateplení zbývajících obvodových konstrukcí, využití sekundární tepelné energie (odpadní teplo) a výměny zdrojů osvětlení ve výrobních prostorech. Cílem projektu je dosáhnout celkové úspory ve výši 498,9 MWh/r. a. (Czech)
0 references
The aim of the project is to implement savings measures in the form of a change of heat sources (replacement of gas boilers in the colic, replacement of gas emitters), the insulation of residual perimeter structures, the use of secondary heat (waste heat), and the exchange of lighting sources in the production areas. The objective of the project is to achieve a total saving of 498.9 MWh/year. (English)
0 references
Identifiers
CZ.01.3.10/0.0/0.0/15_010/0000625
0 references