Extension of roof FVE at H.R.G. spol. s r.o. (Q16637): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Extension of roof FVE at H.R.G. spol. s r.o.

Revision as of 07:54, 22 October 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Extension of roof FVE at H.R.G. spol. s r.o.
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,186,718.92 Czech koruna
    0 references
    127,468.76 Euro
    10 January 2020
    0 references
    4,552,455.6 Czech koruna
    0 references
    182,098.22 Euro
    10 January 2020
    0 references
    70 percent
    0 references
    9 July 2018
    0 references
    10 January 2019
    0 references
    28 February 2019
    0 references
    H. R. G. spol. s r.o.
    0 references
    0 references

    49°51'34.99"N, 16°16'54.84"E
    0 references
    57001
    0 references
    Předmětem projektu je zvýšení hospodárnosti provozu snížením odebírané elektrické energie vyráběné klasicky, díky zvýšené vlastní výrobě z rozšířené instalované fotovoltaické elektrárny. Dojde ke výšení výkonu FVE o 298,1 kWp, což přispěje k roční úspoře konečné spotřeby energie o 286,8 MWh. a. (Czech)
    0 references
    The purpose of the project is to increase the efficiency of the operation by reducing the quantity of electricity generated by the conventional route, thanks to increased production from the large installed photovoltaic power plant. There will be an increase in the performance of FVE by 298,1 kWp, which contributes to annual final energy savings of 286,8 MWth. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011623
    0 references