Sports hall at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils (Q137163): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Fixing rounding issue) |
(Removed claim: summary (P836): The project entitled: ‘The sports centre at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils’ will consist of the expansion of a sports facility. The room will be delivered to the school building on the Southern side. The connecting part of the school and the platform will be a ground connection that is designed in the context of adaptation. The investment will be located on a plot of comfort No...) |
||
Property / summary | |||
Property / summary: The project entitled: ‘The sports centre at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils’ will consist of the expansion of a sports facility. The room will be delivered to the school building on the Southern side. The connecting part of the school and the platform will be a ground connection that is designed in the context of adaptation. The investment will be located on a plot of comfort No 1162/5 by Kostrzyn. The sport room will serve as a school meeting room. On the ground floor, the building will be divided into two parts: the sport room and the social and technical facilities in which the entrance hall, the cloakroom and the bathroom for the athletes will be located, the teacher’s room (coach) — 1 more aid, a storage for sports equipment, a toilet for disabled people, a room for economic affairs, a boiler room and a fan. There will be an audience on the first floor and an assembly team and an auxiliary room. The facilities will include the following facilities: ventilation and boiler rooms. Technical data: Built area: 1 708.50 m², — total area: 1 973.31 m², -cups: 18 971.46 m³ — length of the building of the chamber: 45.26 m, — width of the building of the chamber: 36.16 m — height of the building: 12.51 m — number of floors of the building: 2. The direct group of recipients of this investment will be the pupils of the Primary School in Kostrzyn. In the school year 2015/2016, 800 persons were enrolled in an education establishment, compared to 665 in 2012/2013. The number of students in Kostrzyn is projected to reach 875 students in the school year 2018/2019. The school’s existing sports infrastructure does not meet the pupils’ current needs. The 1 infrastructure of the general education infrastructure will be supported and the capacity of the facility will target 70 people. (English) / rank | |||
Revision as of 19:56, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Sports hall at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils |
Project in Poland financed by DG Regio |
Statements
3,907,656.45 zloty
0 references
9,166,447.25 zloty
0 references
42.63 percent
0 references
16 August 2016
0 references
20 December 2018
0 references
GMINA KOSTRZYN
0 references
Projekt pn. "Sala sportowa przy Szkole Podstawowej w Kostrzynie szansą wszechstronnego rozwoju jej uczniów" będzie polegał na rozbudowie placówki o salę sportową. Sala zostanie dobudowana do budynku szkoły od strony południowej. Elementem łączącym budynek szkoły oraz salę będzie parterowy łącznik, zaprojektowany w ramach adaptacji. Inwestycja zostanie zlokalizowana na działce ewid. nr 1162/5 obręb Kostrzyn. Sala sportowa będzie pełnić funkcję przyszkolnej sali sportowej. Na parterze budynek podzielony będzie na dwie części: salę sportową, oraz zaplecze socjalno-techniczne, w którym zlokalizowane będą hol wejściowy wraz z szatnią, szatnie i łazienki dla sportowców, pokój nauczyciela (trenera) – pomieszczenie 1-szej pomocy, magazyn na sprzęt sportowy, toaleta dla osób niepełnosprawnych, pomieszczenie gospodarcze, kotłownia oraz wentylatornia. Na I piętrze znajdzie się widownia oraz zespół szatniowy i pomieszczenie pomocnicze. W części zaplecza zlokalizowane będą pomieszczenia techniczne: centrala wentylacyjna oraz kotłownia. Dane techniczne: - powierzchnia zabudowy: 1 708,50 m2, - powierzchnia całkowita: 1 973,31 m2, - kubatura: 18 971,46 m3, - długość budynku projektowanej sali: 45,26 m, - szerokość budynku projektowanej sali: 36,16 m, - wysokość budynku projektowanego: 12,51 m, - ilość kondygnacji budynku projektowanego: 2. Bezpośrednią grupę odbiorców niniejszej inwestycji stanowić będą uczniowie Szkoły Podstawowej w Kostrzynie. W roku szkolnym 2015/2016 do placówki oświatowej uczęszczało 800 osób., dla porównania w roku 2012/2013 – 665 osób. Prognozuje się, iż w roku szkolnym 2018/2019 liczba uczniów SP w Kostrzynie wyniesie 875 osób. Istniejąca infrastruktura sportowa szkoły nie zaspokaja aktualnych potrzeb uczniów. Wsparciem zostanie objęty 1 obiekt infrastruktury edukacji ogólnej, a potencjał objętej wsparciem placówki wyniesie docelowo 70 osób. (Polish)
0 references
Identifiers
RPWP.09.03.03-30-0046/16
0 references