(‎Removed claim: summary (P836): The project entitled: ‘The sports centre at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils’ will consist of the expansion of a sports facility. The room will be delivered to the school building on the Southern side. The connecting part of the school and the platform will be a ground connection that is designed in the context of adaptation. The investment will be located on a plot of comfort No...)
Property / summary
The project entitled: ‘The sports centre at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils’ will consist of the expansion of a sports facility. The room will be delivered to the school building on the Southern side. The connecting part of the school and the platform will be a ground connection that is designed in the context of adaptation. The investment will be located on a plot of comfort No 1162/5 by Kostrzyn. The sport room will serve as a school meeting room. On the ground floor, the building will be divided into two parts: the sport room and the social and technical facilities in which the entrance hall, the cloakroom and the bathroom for the athletes will be located, the teacher’s room (coach) — 1 more aid, a storage for sports equipment, a toilet for disabled people, a room for economic affairs, a boiler room and a fan. There will be an audience on the first floor and an assembly team and an auxiliary room. The facilities will include the following facilities: ventilation and boiler rooms. Technical data: Built area: 1 708.50 m², — total area: 1 973.31 m², -cups: 18 971.46 m³ — length of the building of the chamber: 45.26 m, — width of the building of the chamber: 36.16 m — height of the building: 12.51 m — number of floors of the building: 2. The direct group of recipients of this investment will be the pupils of the Primary School in Kostrzyn. In the school year 2015/2016, 800 persons were enrolled in an education establishment, compared to 665 in 2012/2013. The number of students in Kostrzyn is projected to reach 875 students in the school year 2018/2019. The school’s existing sports infrastructure does not meet the pupils’ current needs. The 1 infrastructure of the general education infrastructure will be supported and the capacity of the facility will target 70 people. (English)
 
Property / summary: The project entitled: ‘The sports centre at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils’ will consist of the expansion of a sports facility. The room will be delivered to the school building on the Southern side. The connecting part of the school and the platform will be a ground connection that is designed in the context of adaptation. The investment will be located on a plot of comfort No 1162/5 by Kostrzyn. The sport room will serve as a school meeting room. On the ground floor, the building will be divided into two parts: the sport room and the social and technical facilities in which the entrance hall, the cloakroom and the bathroom for the athletes will be located, the teacher’s room (coach) — 1 more aid, a storage for sports equipment, a toilet for disabled people, a room for economic affairs, a boiler room and a fan. There will be an audience on the first floor and an assembly team and an auxiliary room. The facilities will include the following facilities: ventilation and boiler rooms. Technical data: Built area: 1 708.50 m², — total area: 1 973.31 m², -cups: 18 971.46 m³ — length of the building of the chamber: 45.26 m, — width of the building of the chamber: 36.16 m — height of the building: 12.51 m — number of floors of the building: 2. The direct group of recipients of this investment will be the pupils of the Primary School in Kostrzyn. In the school year 2015/2016, 800 persons were enrolled in an education establishment, compared to 665 in 2012/2013. The number of students in Kostrzyn is projected to reach 875 students in the school year 2018/2019. The school’s existing sports infrastructure does not meet the pupils’ current needs. The 1 infrastructure of the general education infrastructure will be supported and the capacity of the facility will target 70 people. (English) / rank
Normal rank
 

Revision as of 19:56, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Sports hall at the Primary School in Kostrzyn as an opportunity for the comprehensive development of its pupils
Project in Poland financed by DG Regio

    Statements

    0 references
    3,907,656.45 zloty
    0 references
    937,837.55 Euro
    13 January 2020
    0 references
    9,166,447.25 zloty
    0 references
    2,199,947.34 Euro
    13 January 2020
    0 references
    42.63 percent
    0 references
    16 August 2016
    0 references
    20 December 2018
    0 references
    GMINA KOSTRZYN
    0 references
    0 references
    Projekt pn. "Sala sportowa przy Szkole Podstawowej w Kostrzynie szansą wszechstronnego rozwoju jej uczniów" będzie polegał na rozbudowie placówki o salę sportową. Sala zostanie dobudowana do budynku szkoły od strony południowej. Elementem łączącym budynek szkoły oraz salę będzie parterowy łącznik, zaprojektowany w ramach adaptacji. Inwestycja zostanie zlokalizowana na działce ewid. nr 1162/5 obręb Kostrzyn. Sala sportowa będzie pełnić funkcję przyszkolnej sali sportowej. Na parterze budynek podzielony będzie na dwie części: salę sportową, oraz zaplecze socjalno-techniczne, w którym zlokalizowane będą hol wejściowy wraz z szatnią, szatnie i łazienki dla sportowców, pokój nauczyciela (trenera) – pomieszczenie 1-szej pomocy, magazyn na sprzęt sportowy, toaleta dla osób niepełnosprawnych, pomieszczenie gospodarcze, kotłownia oraz wentylatornia. Na I piętrze znajdzie się widownia oraz zespół szatniowy i pomieszczenie pomocnicze. W części zaplecza zlokalizowane będą pomieszczenia techniczne: centrala wentylacyjna oraz kotłownia. Dane techniczne: - powierzchnia zabudowy: 1 708,50 m2, - powierzchnia całkowita: 1 973,31 m2, - kubatura: 18 971,46 m3, - długość budynku projektowanej sali: 45,26 m, - szerokość budynku projektowanej sali: 36,16 m, - wysokość budynku projektowanego: 12,51 m, - ilość kondygnacji budynku projektowanego: 2. Bezpośrednią grupę odbiorców niniejszej inwestycji stanowić będą uczniowie Szkoły Podstawowej w Kostrzynie. W roku szkolnym 2015/2016 do placówki oświatowej uczęszczało 800 osób., dla porównania w roku 2012/2013 – 665 osób. Prognozuje się, iż w roku szkolnym 2018/2019 liczba uczniów SP w Kostrzynie wyniesie 875 osób. Istniejąca infrastruktura sportowa szkoły nie zaspokaja aktualnych potrzeb uczniów. Wsparciem zostanie objęty 1 obiekt infrastruktury edukacji ogólnej, a potencjał objętej wsparciem placówki wyniesie docelowo 70 osób. (Polish)
    0 references

    Identifiers

    RPWP.09.03.03-30-0046/16
    0 references