(Removed claim: summary (P836): The aim of the project is to rebuild a part of the existing building of an Intermunicipal Industrial Activity Unit (103.72 m²), to adapt the existing external wind farm to the premises of the warehouse (86.73 m²) and to implement new external electrical and sanitary installations with a change in the sewage pumping station to increase its location and change its location. In addition, the project envisages the purchase and installation of equi...) |
(Created claim: summary (P836): The subject of the project is the reconstruction of parts of the existing building of the Intercommunity Department of Occupational Activity (103,72 m²), the adaptation of the existing external shelter by the building into a warehouse room (86.73 m²) and the construction of new electrical and sanitary sewerage systems, together with the change of the sanitary drainage pumping room and the change of its location. In addition, the project plans to...) |
||||||||||||||
Property / summary | |||||||||||||||
The subject of the project is the reconstruction of parts of the existing building of the Intercommunity Department of Occupational Activity (103,72 m²), the adaptation of the existing external shelter by the building into a warehouse room (86.73 m²) and the construction of new electrical and sanitary sewerage systems, together with the change of the sanitary drainage pumping room and the change of its location. In addition, the project plans to purchase and install new laundry equipment and the installation of a new ventilation system. The list of equipment shall include: 4) tumble dryer, electric heating up to 37 kg – 2 pcs, 3) drying glass, diameter 500 mm, length of the cylinder 3000 mm – 1 pieces, 4) automatic washing machine for the disinfection of trolleys 1000x1000-1 pc. 12) commercial vehicle with loading up to 3.5 tonnes- 1 pcs. Due to the nature of the project (infrastructural development of the existing Plant), the use of the full functionality of the infrastructure created as a result of its implementation will be possible 3 months after its completion. The project does not require additional action to make full use of it. Thanks to the launch of the Intercommunity Department of Professional Activity in 2014, the applicant is provided with technical, human resources and knowledge to ensure the effective functioning of the infrastructure after completion of the project. Data on purchases and works carried out can be found in p (English) | |||||||||||||||
Property / summary: The subject of the project is the reconstruction of parts of the existing building of the Intercommunity Department of Occupational Activity (103,72 m²), the adaptation of the existing external shelter by the building into a warehouse room (86.73 m²) and the construction of new electrical and sanitary sewerage systems, together with the change of the sanitary drainage pumping room and the change of its location. In addition, the project plans to purchase and install new laundry equipment and the installation of a new ventilation system. The list of equipment shall include: 4) tumble dryer, electric heating up to 37 kg – 2 pcs, 3) drying glass, diameter 500 mm, length of the cylinder 3000 mm – 1 pieces, 4) automatic washing machine for the disinfection of trolleys 1000x1000-1 pc. 12) commercial vehicle with loading up to 3.5 tonnes- 1 pcs. Due to the nature of the project (infrastructural development of the existing Plant), the use of the full functionality of the infrastructure created as a result of its implementation will be possible 3 months after its completion. The project does not require additional action to make full use of it. Thanks to the launch of the Intercommunity Department of Professional Activity in 2014, the applicant is provided with technical, human resources and knowledge to ensure the effective functioning of the infrastructure after completion of the project. Data on purchases and works carried out can be found in p (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The subject of the project is the reconstruction of parts of the existing building of the Intercommunity Department of Occupational Activity (103,72 m²), the adaptation of the existing external shelter by the building into a warehouse room (86.73 m²) and the construction of new electrical and sanitary sewerage systems, together with the change of the sanitary drainage pumping room and the change of its location. In addition, the project plans to purchase and install new laundry equipment and the installation of a new ventilation system. The list of equipment shall include: 4) tumble dryer, electric heating up to 37 kg – 2 pcs, 3) drying glass, diameter 500 mm, length of the cylinder 3000 mm – 1 pieces, 4) automatic washing machine for the disinfection of trolleys 1000x1000-1 pc. 12) commercial vehicle with loading up to 3.5 tonnes- 1 pcs. Due to the nature of the project (infrastructural development of the existing Plant), the use of the full functionality of the infrastructure created as a result of its implementation will be possible 3 months after its completion. The project does not require additional action to make full use of it. Thanks to the launch of the Intercommunity Department of Professional Activity in 2014, the applicant is provided with technical, human resources and knowledge to ensure the effective functioning of the infrastructure after completion of the project. Data on purchases and works carried out can be found in p (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:46, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction and modernisation of the Good Work and Development Unit in Good Practice — modernisation and development of the Faculty of Laundromat. |
Project in Poland financed by DG Regio |
Statements
1,407,812.77 zloty
0 references
1,656,250.35 zloty
0 references
85.0 percent
0 references
29 April 2016
0 references
30 June 2018
0 references
POLSKIE STOWARZYSZENIE NA RZECZ OSÓB Z NIEPEŁNOSPRAWNOŚCIĄ INTELEKTUALNĄ, KOŁO W SZCZECINIE
0 references
Przedmiotem projektu jest przebudowa części istniejącego budynku Międzygminnego Zakładu Aktywności Zawodowej (103,72 m2) , adaptacja istniejącej wiaty zewnętrznej przy budynku na pomieszczenie magazynu (86,73 m2) oraz wykonanie nowych instalacji zewnętrznych elektrycznych i kanalizacji sanitarnej wraz ze zmianą przepompowni kanalizacji sanitarnej na większą i zmianą jej lokalizacji. Ponadto, w ramach projektu planowany jest zakup i instalacja wyposażenia nowej pralni oraz montaż nowego systemu wentylacji. Wykaz wyposażenia obejmuje: 1) Pralnico-wirówkę wysokoobrotową z barierą higieny, podgrzewanie elektryczne, załadunek 50 kg – 2 szt., 2) Suszarkę bębnową, grzanie elektryczne, załadunek do 37 kg – 2 szt., 3) Magiel elektryczny nieckowy przelotowy, średnica walca 500 mm, długość walca 3000 mm – 1 szt., 4) Przelotowa automatyczna myjnia do dezynfekcji wózków 1000x1000 – 1 szt., 5) Kontener siatkowy jezdny do bielizny czystej lub brudnej – 10 szt., 6) Pakowarka foliowa pozioma – 1 szt., 7) Regał magazynowy 4 półkowy aluminiowy 1200x500 – 6 szt., 8) Stół do prasowania ręcznego z wytwornicą pary – 2 szt., 9) Stół pomocniczy stalowy 2000x700 na kółkach – 2 szt., 10) Wózek międzyoperacyjny do przewożenia wsadu z pralnico-wirówek do suszarek – 4 szt., 11) Stacja dystrybucji i dozowania środków chemicznych – 1 szt. 12) Samochód dostawczy o załadunku do 3,5 tony– 1 szt. Z uwagi na charakter projektu (rozwój infrastrukturalny istniejącego Zakładu) wykorzystanie pełnej funkcjonalności infrastruktury powstałej w wyniku jego realizacji będzie możliwe 3 miesiące po jego zakończeniu. Przedsięwzięcie nie wymaga dodatkowych działań w celu jego pełnego wykorzystania. Wnioskodawca, dzięki uruchomieniu w 2014 roku Międzygminnego Zakładu Aktywności Zawodowej, ma zapewnione zasoby techniczne, kadrowe i wiedzę gwarantujące skuteczne funkcjonowanie infrastruktury po zakończeniu realizacji projektu. Dane o zakupionych środkach i wykonanych pracach znajdują się w p (Polish)
0 references
The subject of the project is the reconstruction of parts of the existing building of the Intercommunity Department of Occupational Activity (103,72 m²), the adaptation of the existing external shelter by the building into a warehouse room (86.73 m²) and the construction of new electrical and sanitary sewerage systems, together with the change of the sanitary drainage pumping room and the change of its location. In addition, the project plans to purchase and install new laundry equipment and the installation of a new ventilation system. The list of equipment shall include: 4) tumble dryer, electric heating up to 37 kg – 2 pcs, 3) drying glass, diameter 500 mm, length of the cylinder 3000 mm – 1 pieces, 4) automatic washing machine for the disinfection of trolleys 1000x1000-1 pc. 12) commercial vehicle with loading up to 3.5 tonnes- 1 pcs. Due to the nature of the project (infrastructural development of the existing Plant), the use of the full functionality of the infrastructure created as a result of its implementation will be possible 3 months after its completion. The project does not require additional action to make full use of it. Thanks to the launch of the Intercommunity Department of Professional Activity in 2014, the applicant is provided with technical, human resources and knowledge to ensure the effective functioning of the infrastructure after completion of the project. Data on purchases and works carried out can be found in p (English)
21 October 2020
0 references
Identifiers
RPZP.09.02.00-32-0001/16
0 references