Construction of Western Pomerania cycle route network — Trasa Popjeszier Western stage II (Q137971): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The project takes place in the Zachodniopomorskie area. The project consists of the construction of a total length of 13.74 km of bicycle routes for the calculation of the 24.575 km indicator. It consists of six investment sections: 0.711 km and dł.odci to means of approx. 2.382 km, — the Myśborz section — boulder — 4.228 km, followed by signs ca. 5.689 km, — Sulimierz — Mostkovo. G Myślisbórz 2.872 km (total 2.915 km) — m. Barlinek — pass. 0....)
(‎Created claim: summary (P836): The project takes place in the area of the West Pomeranian Voivodeship. The project consists of the construction of sections of bicycle routes with a total length of 13.74 km, to calculate the indicator of 24.575 km. It consists of six investment sections:- passage through M. Myślibórz – approx. 0.711 km, and long distance to signs approx. 2.382 km, – section of Myślibórz – Głazów – length approx. 4.228 km, and long mark approx. 5,689 km, – Suli...)
Property / summary
 
The project takes place in the area of the West Pomeranian Voivodeship. The project consists of the construction of sections of bicycle routes with a total length of 13.74 km, to calculate the indicator of 24.575 km. It consists of six investment sections:- passage through M. Myślibórz – approx. 0.711 km, and long distance to signs approx. 2.382 km, – section of Myślibórz – Głazów – length approx. 4.228 km, and long mark approx. 5,689 km, – Sulimierz – Mostkowo na odc. G Thoughtsborz – ok. 2.872 km (total 2.915 km) – passage through Barlinek – approx. 0.035 km, and long signs approx. 1.760 km, – passage through M. Pełczyce – approx. 0.846 km, and long signs approx. 1.066 km, – Pełczyce -Choszczno on Płotno-Pełczyce – length approx.4.986km (total 5.005 km). The project will be implemented in the natural area of Barlinecko-Gorzowski Landscape Park – enclosed. Scope of basic works:1.Preparatory works: measuring, removal of trees and shrubs, demolition works,2.Groundworks: excavations, embankments, troughs with moulding and compaction of the ground,3.Finishing works: execution of cycle path and exits with border,4.Finishing robots,5.Traffic organisation, which will be introduced on the basis of approved design of permanent traffic organisation. The project will be implemented using typical construction equipment, i.e. excavator, loader, compactor, vans and self-loading vehicles.The stages of the project are:1.Development of project documentation,2.Implementation of construction works,3.Investment supervision,4.Implementation of promotional and information activities,5.Providing the sustainability of the project.After completion of the project, it will be possible to use the full functionality of the infrastructure created within the project.For the implementation of the project, it will be possible to provide long-term resources for the project and to ensure the sustainability of the project. (English)
Property / summary: The project takes place in the area of the West Pomeranian Voivodeship. The project consists of the construction of sections of bicycle routes with a total length of 13.74 km, to calculate the indicator of 24.575 km. It consists of six investment sections:- passage through M. Myślibórz – approx. 0.711 km, and long distance to signs approx. 2.382 km, – section of Myślibórz – Głazów – length approx. 4.228 km, and long mark approx. 5,689 km, – Sulimierz – Mostkowo na odc. G Thoughtsborz – ok. 2.872 km (total 2.915 km) – passage through Barlinek – approx. 0.035 km, and long signs approx. 1.760 km, – passage through M. Pełczyce – approx. 0.846 km, and long signs approx. 1.066 km, – Pełczyce -Choszczno on Płotno-Pełczyce – length approx.4.986km (total 5.005 km). The project will be implemented in the natural area of Barlinecko-Gorzowski Landscape Park – enclosed. Scope of basic works:1.Preparatory works: measuring, removal of trees and shrubs, demolition works,2.Groundworks: excavations, embankments, troughs with moulding and compaction of the ground,3.Finishing works: execution of cycle path and exits with border,4.Finishing robots,5.Traffic organisation, which will be introduced on the basis of approved design of permanent traffic organisation. The project will be implemented using typical construction equipment, i.e. excavator, loader, compactor, vans and self-loading vehicles.The stages of the project are:1.Development of project documentation,2.Implementation of construction works,3.Investment supervision,4.Implementation of promotional and information activities,5.Providing the sustainability of the project.After completion of the project, it will be possible to use the full functionality of the infrastructure created within the project.For the implementation of the project, it will be possible to provide long-term resources for the project and to ensure the sustainability of the project. (English) / rank
 
Normal rank
Property / summary: The project takes place in the area of the West Pomeranian Voivodeship. The project consists of the construction of sections of bicycle routes with a total length of 13.74 km, to calculate the indicator of 24.575 km. It consists of six investment sections:- passage through M. Myślibórz – approx. 0.711 km, and long distance to signs approx. 2.382 km, – section of Myślibórz – Głazów – length approx. 4.228 km, and long mark approx. 5,689 km, – Sulimierz – Mostkowo na odc. G Thoughtsborz – ok. 2.872 km (total 2.915 km) – passage through Barlinek – approx. 0.035 km, and long signs approx. 1.760 km, – passage through M. Pełczyce – approx. 0.846 km, and long signs approx. 1.066 km, – Pełczyce -Choszczno on Płotno-Pełczyce – length approx.4.986km (total 5.005 km). The project will be implemented in the natural area of Barlinecko-Gorzowski Landscape Park – enclosed. Scope of basic works:1.Preparatory works: measuring, removal of trees and shrubs, demolition works,2.Groundworks: excavations, embankments, troughs with moulding and compaction of the ground,3.Finishing works: execution of cycle path and exits with border,4.Finishing robots,5.Traffic organisation, which will be introduced on the basis of approved design of permanent traffic organisation. The project will be implemented using typical construction equipment, i.e. excavator, loader, compactor, vans and self-loading vehicles.The stages of the project are:1.Development of project documentation,2.Implementation of construction works,3.Investment supervision,4.Implementation of promotional and information activities,5.Providing the sustainability of the project.After completion of the project, it will be possible to use the full functionality of the infrastructure created within the project.For the implementation of the project, it will be possible to provide long-term resources for the project and to ensure the sustainability of the project. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:41, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of Western Pomerania cycle route network — Trasa Popjeszier Western stage II
Project in Poland financed by DG Regio

    Statements

    0 references
    9,619,362.83 zloty
    0 references
    2,308,647.08 Euro
    13 January 2020
    0 references
    11,316,897.46 zloty
    0 references
    2,716,055.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 June 2019
    0 references
    31 December 2020
    0 references
    WOJEWÓDZTWO ZACHODNIOPOMORSKIE
    0 references
    Realizacja projektu odbywa się na obszarze woj zachodniopomorskiego. Projekt polega na budowie odcinków tras rowerowych o łącznej długości 13,74 km, dla wyliczenia wskaźnika 24,575 km. Składa się on z sześciu odcinków inwestycyjnych :- przejście przez m. Myślibórz – dł. ok. 0,711 km, a dł.odci do oznakow ok. 2,382 km, - odcinek Myślibórz – Głazów - dł ok. 4,228 km, a dł oznakow ok. 5,689 km, - Sulimierz – Mostkowo na odc. G Myślibórz - dł ok. 2,872 km(ogółem 2,915 km) - przejście przez m. Barlinek - dł ok. 0,035 km, a dł oznak ok. 1,760 km, - przejście przez m. Pełczyce - dł ok. 0,846 km, a dł oznak ok. 1,066 km, - Pełczyce -Choszczno na odc.Płotno-Pełczyce - dł ok.4,986km(ogółem 5,005 km) . Projekt realizowany będzie na obszarze cennym przyrodniczo jakim jest Barlinecko-Gorzowski Park Krajobrazowy - otulina. Zakres robót podstawowych:1.Roboty przygotowawcze: pomiarowe, usunięcie drzew i krzewów, roboty rozbiórkowe,2.Roboty ziemne: wykonanie wykopów, nasypów, koryta z profilowaniem i zagęszczeniem podłoża,3.Roboty nawierzchniowe: wykonanie ścieżki rowerowej i zjazdów wraz z obramowaniem,4.Roboty wykończeniowe,5.Organizacja ruchu, która zostanie wprowadzona na podstawie zatwierdzonego projektu stałej organizacji ruchu. Przedsięwzięcie zrealizowane zostanie z zastosowaniem typowego sprzętu budowlanego, tj. koparka, ładowarka, zagęszczarka, samochody dostawcze i samowyładowcze.Etapy projektu to:1.Opracowanie dokumentacji projektowej,2.Realizacja prac budowlanych,3.Nadzór inwestorski,4.Realizacja działań promocyjno-informacyjnych,5.Zapewnienie trwałości projektu.Po zakończeniu realizacji projektu możliwe będzie wykorzystanie pełnej funkcjonalności infrastruktury powstałej w ramach projektu.Za realizację projektu w trakcie jego trwania odpowiadać będzie ZZDW w Koszalinie, który posiada wieloletnie doświadczenie w przygotowywaniu i realizacji inwestycji drogowych, wykwalifikowaną i doświadczoną kadrę oraz niezbędne zasoby techniczne. (Polish)
    0 references
    The project takes place in the area of the West Pomeranian Voivodeship. The project consists of the construction of sections of bicycle routes with a total length of 13.74 km, to calculate the indicator of 24.575 km. It consists of six investment sections:- passage through M. Myślibórz – approx. 0.711 km, and long distance to signs approx. 2.382 km, – section of Myślibórz – Głazów – length approx. 4.228 km, and long mark approx. 5,689 km, – Sulimierz – Mostkowo na odc. G Thoughtsborz – ok. 2.872 km (total 2.915 km) – passage through Barlinek – approx. 0.035 km, and long signs approx. 1.760 km, – passage through M. Pełczyce – approx. 0.846 km, and long signs approx. 1.066 km, – Pełczyce -Choszczno on Płotno-Pełczyce – length approx.4.986km (total 5.005 km). The project will be implemented in the natural area of Barlinecko-Gorzowski Landscape Park – enclosed. Scope of basic works:1.Preparatory works: measuring, removal of trees and shrubs, demolition works,2.Groundworks: excavations, embankments, troughs with moulding and compaction of the ground,3.Finishing works: execution of cycle path and exits with border,4.Finishing robots,5.Traffic organisation, which will be introduced on the basis of approved design of permanent traffic organisation. The project will be implemented using typical construction equipment, i.e. excavator, loader, compactor, vans and self-loading vehicles.The stages of the project are:1.Development of project documentation,2.Implementation of construction works,3.Investment supervision,4.Implementation of promotional and information activities,5.Providing the sustainability of the project.After completion of the project, it will be possible to use the full functionality of the infrastructure created within the project.For the implementation of the project, it will be possible to provide long-term resources for the project and to ensure the sustainability of the project. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.04.06.00-32-2001/19
    0 references