Q137884 (Q137884): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project shall include the extension of a water supply station in the scope of: planting of the technological hall building in relation to existing facilities, technical and technological solutions for water treatment, installation of deep-sea pumps and well enclosures, internal and external water-channel installations, within the area of plot 89/173, electrical and ACPA.The final effect of the project will be to improve water quality and ens...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 19:37, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
672,611.42 zloty
0 references
791,307.58 zloty
0 references
85.0 percent
0 references
27 November 2015
0 references
20 June 2017
0 references
PRZEDSIĘBIORSTWO WODOCIĄGÓW I KANALIZACJI SP. Z O.O.
0 references
Przedsięwzięcie obejmuje rozbudowę stacji wodociągowej w zakresie: posadowienia budynku hali technologicznej w nawiązaniu do istniejących obiektów, rozwiązań technicznych i technologicznych uzdatniania wody, montażu pomp głębinowych i obudów studziennych, instalacji wewnętrznych i zewnętrzne wod-kan, w obrębie działki 89/173, instalacji elektrycznej i AKPiA.Efektem końcowym realizacji projektu będzie poprawa jakości wody oraz zapewnienie ciągłości jej dostawy do mieszkańców miejscowości Borne Sulinowo , Łączno, Ciemino, Jeleń, Jelonek, Przyjezierze, Krągi, Śmiadowo i Dąbrowica. Typy rozwiązań technicznych i technologicznych zostały dostosowane do istniejącego stanu uzbrojeń terenu, ukształtowania terenu i jego aktualnego zagospodarowania. Projekt zakłada budowę nowej hali technologicznej w nawiązaniu do istniejącej w bezpośrednim jej sąsiedztwie, co sprawi maksymalne wykorzystanie terenu i kompaktowość stacji oraz minimalizację połączeń rurociągów. Stacja będzie pracowała w pełni automatycznie, z monitoringiem stanu urządzeń i przesyłem danych do systemu wizualizacji komputerowej w siedzibie eksploatatora. Technologia uzdatniania wody oparta będzie na procesach naturalnych –napowietrzaniu i filtracji, bez dozowania chemikaliów i silnych utleniaczy. Projekt zakłada optymalizację doboru urządzeń w aspekcie techniczno – ekonomicznym oraz oszczędność wody i energii w pracy SUW. (Polish)
0 references
The project shall include the extension of a water supply station in the scope of: planting of the technological hall building in relation to existing facilities, technical and technological solutions for water treatment, installation of deep-sea pumps and well enclosures, internal and external water-channel installations, within the area of plot 89/173, electrical and ACPA.The final effect of the project will be to improve water quality and ensure the continuity of its supply to residents of Borne Sulinowo, Łączno, Ciemino, Jeleń, Jelonek, Przyjezierze, Przyjezierze, Krą. The types of technical and technological solutions have been adapted to the existing state of land armaments, terrain and its current development. The project envisages the construction of a new technological hall in relation to the existing in the immediate vicinity, which will result in maximum use of the terrain and compactness of the station and minimisation of pipeline connections. The station will work fully automatically, with monitoring of equipment status and data transfer to the computer visualisation system at the operator’s premises. Water treatment technology will be based on natural processes – aeration and filtration, without dispensing chemicals and strong oxidisers. The project involves optimising the selection of equipment in the technical and economic aspect and saving water and energy in the operation of the SUW. (English)
21 October 2020
0 references
Identifiers
RPZP.03.05.00-32-A006/16
0 references