“Expansion of rainwater discharge systems in Dziwnów commune” (Q137854): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
“Expansion of rainwater discharge systems in Dziwnów commune”

Revision as of 19:31, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Expansion of rainwater discharge systems in Dziwnów commune”
Project in Poland financed by DG Regio

    Statements

    0 references
    2,036,819.74 zloty
    0 references
    488,836.74 Euro
    13 January 2020
    0 references
    2,396,258.52 zloty
    0 references
    575,102.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2019
    0 references
    31 December 2020
    0 references
    GMINA DZIWNÓW
    0 references
    W wyniku realizacji projektu długość kanalizacji deszczowej na terenie gminy Dziwnów zwiększy się o 0,97 km. ZBIORNIK RETENCYJNY WOD OPADOWYCH. Zostanie wykonany na terenie zielonym w sąsiedztwie ul. Parkowej (wraz z zagospodarowaniem terenu zbiornika) Wyposażony zostanie w: urządzenia podczyszczające, instalację do podlewania zieleni na terenie parku oraz dwie pompy zatapialne do przepompowywania nadmiaru wód oraz rurociągu tłocznego nadmiaru wód do studzienki rozprężnej na kanale deszczowym. KANALIZACJA DESZCZOWA: wykonanie nowej kanalizacji, przełożenie odcinka kanału, wymiana pomp w przepompowni, wykonanie instalacji elekt., monitoringu, odtworzeni nawierzchni dróg i chodników. (Polish)
    0 references
    As a result of the project, the length of rainwater drainage in Dziwnów commune will increase by 0.97 km. RAINWATER RETENTION TANK. It will be made in the green area in the vicinity of the street. The park (including the development of the reservoir) will be equipped with: cleaning equipment, installation for watering green in the park, and two sink pumps for pumping excess water and a discharge pipeline of excess water to the expansion well on the rainwater channel. RAINWATER SEWERAGE: construction of a new sewerage system, transmission of the channel section, replacement of pumps in the pumping room, execution of electrical installations, monitoring, reconstructed road surfaces and pavements. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.03.03.00-32-B009/18
    0 references