Construction of a rain-pressure drainage network along with a rainwater pumping station from Lotniki Street to the Little Ina River through Main Street in Stargard. (Q137843): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in 1 language: remove_english_label) |
(Changed label, description and/or aliases in 1 language: translated_label) |
||
label / en | label / en | ||
Construction of a rain-pressure drainage network along with a rainwater pumping station from Lotniki Street to the Little Ina River through Main Street in Stargard. |
Revision as of 19:30, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a rain-pressure drainage network along with a rainwater pumping station from Lotniki Street to the Little Ina River through Main Street in Stargard. |
Project in Poland financed by DG Regio |
Statements
897,417.56 zloty
0 references
1,055,785.37 zloty
0 references
85.0 percent
0 references
15 February 2016
0 references
31 January 2018
0 references
GMINA MIASTO STARGARD
0 references
Przedmiotem inwestycji jest budowa sieci kanalizacji deszczowej od istniejących elementów sieci w ul.Lotników i przekierowanie ich do układu projektowanej przepompowni w ul.Lotników i dalej rurociągiem tłocznym wzdłuż całej ul.Głównej do wylotu do rzeki Mała Ina powyżej jazu. Wylot ścieków zlokalizowany będzie powyżej ujęcia wody pitnej. Układ zabezpieczy odprowadzanie wód opadowych z dzielnic mieszkalnych wzdłuż ul.Lotników i ul.Kolejowej z terenem przyległym do ul. Lotników oraz zapewni zmniejszenie ryzyka powodziowego tych terenów. Planowane prace budowlane obejmują: 1. Budowę sieci kanalizacji deszczowej tłocznej 2. Budowę przepompowni ścieków wód deszczowych 3. Budowę sieci kanalizacji deszczowej grawitacyjnej. Wybrane rozwiązania technologiczne zostały opisane w pkt.3.1.2.1 SW. Inwestycja zrealizowana zostanie w ramach następujących zadań: przeprowadzenie procedury związanej z prawem zamówień publicznych i wyłonienie wykonawcy, przygotowanie dokumentacji (zadanie obejmuje przygotowanie dokumentacji technicznej projektu, uzyskanie wszystkich wymaganych prawem zgód, porozumień oraz pozwoleń); wykonanie robót budowlanych, promocja i informacja projektu, rozliczenie projektu. Podczas wdrażania projektu, Wnioskodawca szczególną rolę przywiązywać będzie do realizacji obowiązujących w projekcie procedur. Zarówno pracownicy Wnioskodawcy tworzący Zespół wdrażający projekt jak i osoby odpowiedzialne za nadzór nad inwestycją odpowiadać będą na bieżąco przed organem wdrażającym RPO za prawidłową implementację projektu pod względem prawnym, merytorycznym i finansowym. Pozwala to na zarządzanie projektem w sposób skuteczny i efektywny. Doświadczenie w realizacji wcześniejszych projektów w ramach funduszy UE pozwoliło wytworzyć mechanizmy wdrażania, dzięki którym niniejszy projekt będzie implementowany w sposób gwarantujący rzetelne wykorzystanie dotacji i skuteczność w osiąganiu zaplanowanych celów. Projekt ma charakter stacjonarny. (Polish)
0 references
The subject of the investment is the construction of a rainwater sewer system from the existing elements of the network in Lotniki Street and redirecting them to the layout of the designed pumping plant in Lotniki Street and further along the entire Main Street to the exit to the Mała Ina river above the junction. The effluent outlet will be located above the drinking water intake. The system will ensure the drainage of rainwater from residential districts along Lotnik Street and Kolejowa Street with an area adjacent to the street. Airmen and ensure that the flood risk of these areas is reduced. Planned construction works shall include: 1. Construction of rainwater drainage network 2. Construction of rainwater pumping station 3. Construction of a gravitational rainwater drainage network. Selected technological solutions are described in clause.3.1.2.1 SW. The investment will be carried out as part of the following tasks: carrying out a procedure related to public procurement law and selection of economic operator, preparation of documentation (the task includes preparing the technical documentation of the project, obtaining all legal consents, agreements and permits); execution of construction works, project promotion and information, project settlement. During the implementation of the project, the applicant will attach a special role to the implementation of the procedures in force in the project. Both the Applicant’s employees creating the project implementation team and the persons responsible for the supervision of the investment will be responsible for the legal, substantive and financial implementation of the project to the implementing body of the RPO. This allows the project to be managed effectively and efficiently. Experience in the implementation of earlier projects under EU funds has created implementation mechanisms to implement this project in such a way as to ensure the reliable use of grants and effectiveness in achieving the planned objectives. The project is stationary. (English)
21 October 2020
0 references
Identifiers
RPZP.03.03.00-32-A010/16
0 references