Solar energy for renewable electricity generation through the photovoltaic installation on the site of SANWLL (Q137807): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Fixing rounding issue)
(‎Removed claim: summary (P836): The project design concept for the implementation of a 190.32 kW photovoltaic power plant in Gądbottom, municipality of Gryfino, on the roof of an existing hall building with power output based on diffuse wave strips. The Gardno.eu site is characterised by a high level of electricity consumption of 200 MWh/year. The Gdno.eu photovoltaic installation with a power output of 190.32 kW in Garbottom will be owned by the company Sanwill Łukasz Pawlo...)
Property / summary
The project design concept for the implementation of a 190.32 kW photovoltaic power plant in Gądbottom, municipality of Gryfino, on the roof of an existing hall building with power output based on diffuse wave strips. The Gardno.eu site is characterised by a high level of electricity consumption of 200 MWh/year. The Gdno.eu photovoltaic installation with a power output of 190.32 kW in Garbottom will be owned by the company Sanwill Łukasz Pawlowski, with headquarters at street capital 5/5, in Szczecin, hereinafter referred to as the manufacturer. The solar installation will be located on plot No eard. 58/6 in Garbottom, municipality of Gryfino, county of Gryfino. The land on which the investment is made is not entered in the register of monuments and is not protected by the local land use plan. The project does not come into conflict with its forests, lively and non-lively monuments. The site is not included in the Natura 2000 programme. The project will not be implemented in partnership. The applicant shall provide for the performance of contracts to select economic operators: a design documentation and a contractor of a photovoltaic installation, an investor surveillance contractor and a contractor for promotional activities. The applicant shall, for the intended purpose of the project, review the progress of the project, including the process to achieve that project, on a stationary basis, to be carried out within the following period: 15.01.2018-31.12.2018 (English)
 
Property / summary: The project design concept for the implementation of a 190.32 kW photovoltaic power plant in Gądbottom, municipality of Gryfino, on the roof of an existing hall building with power output based on diffuse wave strips. The Gardno.eu site is characterised by a high level of electricity consumption of 200 MWh/year. The Gdno.eu photovoltaic installation with a power output of 190.32 kW in Garbottom will be owned by the company Sanwill Łukasz Pawlowski, with headquarters at street capital 5/5, in Szczecin, hereinafter referred to as the manufacturer. The solar installation will be located on plot No eard. 58/6 in Garbottom, municipality of Gryfino, county of Gryfino. The land on which the investment is made is not entered in the register of monuments and is not protected by the local land use plan. The project does not come into conflict with its forests, lively and non-lively monuments. The site is not included in the Natura 2000 programme. The project will not be implemented in partnership. The applicant shall provide for the performance of contracts to select economic operators: a design documentation and a contractor of a photovoltaic installation, an investor surveillance contractor and a contractor for promotional activities. The applicant shall, for the intended purpose of the project, review the progress of the project, including the process to achieve that project, on a stationary basis, to be carried out within the following period: 15.01.2018-31.12.2018 (English) / rank
Normal rank
 

Revision as of 19:29, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar energy for renewable electricity generation through the photovoltaic installation on the site of SANWLL
Project in Poland financed by DG Regio

    Statements

    0 references
    718,103.8 zloty
    0 references
    172,344.91 Euro
    13 January 2020
    0 references
    844,828.0 zloty
    0 references
    202,758.72 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    30 June 2019
    0 references
    SANWILL ŁUKASZ PAWŁOWSK
    0 references
    0 references
    Przedmiotem projektu koncepcja realizacji instalacji fotowoltaicznej o mocy 190,32 kW w miejscowości Gardno, gmina Gryfino, posadowionej na dachu istniejącego budynku hali z wyprowadzeniem mocy w oparciu o falowniki rozproszone. Obiekt Gardno.eu cechuje się wysokim zużyciem energii elektrycznej na poziomie 200 MWh/rok. Instalacja Fotowoltaiczna Gardno.eu o mocy 190,32 kW w miejscowości Gardno będzie należeć do firmy z Sanwill Łukasz Pawłowski z siedzibą przy ulicy Kapitańskiej 5/5 w miejscowości Szczecin, zwanej dalej Wytwórcą. Instalacja Fotowoltaiczna zlokalizowana będzie na działce o nr ewid. 58/6 w miejscowości Gardno, gmina Gryfino, powiat gryfiński. Działka, na której projektowana jest inwestycja, nie jest wpisana do rejestru zabytków i nie podlega ochronie na podstawie ustaleń miejscowego planu zagospodarowania przestrzennego. Projektowana inwestycja nie wchodzi w kolizje z terenami leśnymi, pomnikami przyrody ożywionej i nieożywionej. Teren ten nie jest zaliczony do programu Natura 2000. Projekt nie będzie realizowany w partnerstwie. Wnioskodawca przewiduje przeprowadzenie zamówień, aby wyłonić wykonawców: dokumentacji projektowej oraz wykonawcy instalacji fotowoltaicznej, wykonawcy nadzoru inwestorskiego i wykonawcy działań promocyjnych. Wnioskodawca w celu planowanego przeprowadzenia projektu będzie systematycznie kontrolować przebieg realizacji przedsięwzięcia, w tym proces osiągania założonych efektów.Projekt ma charakter stacjonarny, realizowany w terminie: 15.01.2018-31.12.2018 (Polish)
    0 references

    Identifiers

    RPZP.02.10.00-32-B189/17
    0 references