Q137736 (Q137736): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project is stationary. The area for construction is located in Barzkowice on plot no. 51/2 of Barzkowice. The subject of the project is the construction of a photovoltaic installation with a power of 38.40 kW – 128 photovoltaic cells with a capacity of 300Wp each. A photovoltaic installation is planned to be installed on a free-standing steel structure.The structure will be placed on reinforced concrete alloys. The energy generated from the...) |
(Changed label, description and/or aliases in 1 language: remove_english_label) |
||
label / en | label / en | ||
Revision as of 19:20, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project in Poland financed by DG Regio |
Statements
149,845.35 zloty
0 references
176,288.65 zloty
0 references
85.0 percent
0 references
14 February 2017
0 references
1 February 2019
0 references
ZACHODNIOPOMORSKI OŚRODEK DORADZTWA ROLNICZEGO W BARZKOWICACH
0 references
Projekt ma charakter stacjonarny. Teren przeznaczony pod zabudowę zlokalizowany jest w m. Barzkowice na działce nr 51/2 obręb Barzkowice. Przedmiotem projektu jest budowa instalacji fotowoltaicznej o mocy 38,40kW – 128 ogniwa fotowoltaiczne o mocy 300Wp każde. Przewiduje się budowę instalacji fotowoltaicznej montowanej na wolnostojącej konstrukcji stalowej.Konstrukcja posadowiona będzie na stopach żelbetowych. Energia pozyskana z instalacji będzie przeznaczona na potrzeby funkcjonowania ZODR w Barzkowicach. ETAPY REALIZACJI PROJEKTU: 1). Przygotowanie dokumentacji projektu - opracowanie Studium wykonalności (I kwartał 2017); 2). Prace budowlano - instalacyjne,w tym: przygotowanie terenu pod budowę, konstrukcja wsporcza pod panele, panale fotowoltaiczne, inwertery, kable, zabezpieczenia, akcesoria, montaż instalacji. (III-IV kwartał 2017 r.) 3). Nadzór nad prawidłową realizacją przedsięwzięcia, w tym: usługi Inżyniera Kontraktu (III-IV kwartał 2017 r.) Za realizację projektu odpowiedzialny będzie wyodrębniony przez Wnioskodawcę zespół projektowy. Struktura zespołu zapewni skuteczne wykorzystanie zasobów Ośrodka oraz wsparcie zewnętrznych specjalistów, tak by zagwarantować pełną efektywność i realizację założonych celów. Wnioskodawca jest w pełni gotowy do realizacji inwestycji. Realizacja projektu nie wymaga uzyskania pozwolenia na budowę ani zgłoszenia robót. Okres realizacji projektu: 14.02.2017 do 29.12.2017 r . Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. ZODR w Barzkowicach posiada niezbędne zasoby techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
0 references
The project is stationary. The area for construction is located in Barzkowice on plot no. 51/2 of Barzkowice. The subject of the project is the construction of a photovoltaic installation with a power of 38.40 kW – 128 photovoltaic cells with a capacity of 300Wp each. A photovoltaic installation is planned to be installed on a free-standing steel structure.The structure will be placed on reinforced concrete alloys. The energy generated from the installation will be used for the operation of the ZODR in Barzkowice. STAGES OF PROJECT IMPLEMENTATION: 1. Preparation of project documentation – feasibility study (I quarter 2017); 2. Construction and installation works, including: preparation of the site for construction, support structure for panels, photovoltaic panes, inverters, cables, security features, accessories, installation. (III-IV quarter 2017) 3. Supervision of the correct implementation of the project, including: contract Engineer Services (III-IV quarter 2017) The project team will be responsible for the implementation of the project. The structure of the team will ensure efficient use of the Centre’s resources and support external specialists to ensure full efficiency and achievement of the objectives set. The applicant is fully ready to carry out the investment. The implementation of the project does not require a construction permit or a declaration of works. Period of implementation of the project: 14.02.2017 until 29.12.2017 Technical and technological solutions enable the project to be implemented according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. ZODR in Barzkowice has the necessary technical, human resources and experience to guarantee the correct implementation of the project. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B028/17
0 references