The implementation of solutions using renewable energy sources for the generation of heat needed for the proper functioning of the company for Konsum in Stobnie. (Q137728): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project is stationary. The location will be located at Stobno, Gm Kolbaskowo, Policki, West Berlin. The project will consist of the replacement of a gas furnace into a pipeline furnace (biomass) with a capacity of 69 kW. The installation provides for the processing of waste to be used for heating the Applicant’s production and office buildings. Currently the fuel used to heat the building is the natural gas to be replaced by biomass. THE P...) |
(Created claim: summary (P836): The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, th...) |
||||||||||||||
Property / summary | |||||||||||||||
The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, the fuel used to heat the building is high-methane natural gas, which will be replaced by biomass. STAGES OF PROJECT IMPLEMENTATION: Action 1 Preparation of project documentation – the project feasibility study (I quarter 2017) will be developed as part of the action. Installation and installation works together with the supply of necessary components of biomass combustion plants. The operation involves adapting the current gas boiler room to the installation of biomass processing and combustion plants and the supply and assembly of a biomass combustion furnace, chipper and sawdust granulation lines. As part of the action, expenditure will be paid: Complete installation of the preparation, administration and combustion of biomass (III-IV quarter of 2017) Action 3. Services related to project management and supervision costs. As part of the project, it is necessary to commission the management and supervision service over the implementation of the project.(III-IV quarter 2017) Period of project implementation: 09.02.2017 by 29.12.2017 Technical and technological solutions enable the project to be carried out according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. The applicant shall have the necessary technical, personnel and experience to guarantee the correct implementation of the project. (English) | |||||||||||||||
Property / summary: The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, the fuel used to heat the building is high-methane natural gas, which will be replaced by biomass. STAGES OF PROJECT IMPLEMENTATION: Action 1 Preparation of project documentation – the project feasibility study (I quarter 2017) will be developed as part of the action. Installation and installation works together with the supply of necessary components of biomass combustion plants. The operation involves adapting the current gas boiler room to the installation of biomass processing and combustion plants and the supply and assembly of a biomass combustion furnace, chipper and sawdust granulation lines. As part of the action, expenditure will be paid: Complete installation of the preparation, administration and combustion of biomass (III-IV quarter of 2017) Action 3. Services related to project management and supervision costs. As part of the project, it is necessary to commission the management and supervision service over the implementation of the project.(III-IV quarter 2017) Period of project implementation: 09.02.2017 by 29.12.2017 Technical and technological solutions enable the project to be carried out according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. The applicant shall have the necessary technical, personnel and experience to guarantee the correct implementation of the project. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, the fuel used to heat the building is high-methane natural gas, which will be replaced by biomass. STAGES OF PROJECT IMPLEMENTATION: Action 1 Preparation of project documentation – the project feasibility study (I quarter 2017) will be developed as part of the action. Installation and installation works together with the supply of necessary components of biomass combustion plants. The operation involves adapting the current gas boiler room to the installation of biomass processing and combustion plants and the supply and assembly of a biomass combustion furnace, chipper and sawdust granulation lines. As part of the action, expenditure will be paid: Complete installation of the preparation, administration and combustion of biomass (III-IV quarter of 2017) Action 3. Services related to project management and supervision costs. As part of the project, it is necessary to commission the management and supervision service over the implementation of the project.(III-IV quarter 2017) Period of project implementation: 09.02.2017 by 29.12.2017 Technical and technological solutions enable the project to be carried out according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. The applicant shall have the necessary technical, personnel and experience to guarantee the correct implementation of the project. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:20, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The implementation of solutions using renewable energy sources for the generation of heat needed for the proper functioning of the company for Konsum in Stobnie. |
Project in Poland financed by DG Regio |
Statements
336,413.0 zloty
0 references
395,780.0 zloty
0 references
85.0 percent
0 references
9 February 2017
0 references
20 November 2018
0 references
"KONSBUD" PROJEKTOWANIE I REALIZACJA KONSTRUKCJI BUDOWLANYCH PRZEMYSŁAW ŻUROWSKI
0 references
Projekt ma charakter stacjonarny. Usytuowany będzie w miejsc Stobno, gm Kołbaskowo, pow policki, woj zachodniopom. Przedsięwzięcie polegać będzie na wymianie pieca gazowego, na piec na pellet (biomasa) o mocy instalacji 69 kW. Instalacja przewiduje przetwarzanie odpadów produkc. w postaci zrębów, trocin, zrzyn, klocków ( pellet) w paliwo wykorzystywane do ogrzewania budynku produkcyjno-biurowego Wnioskodawcy. Obecnie wykorzystywanym paliwem do ogrzania budynku jest gaz ziemny wysokometanowy, który zostanie zastąpiony biomasą. ETAPY REALIZACJI PROJEKTU: Działanie 1 Przygotowanie dokumentacji projektu - w ramach działania opracowane zostanie studium wykonalności projektu (I kwartał 2017r.) Działanie 2. Prace montażowo-instalacyjne wraz z dostawą niezbędnych elementów instalacji do spalania biomasy. Działanie zakłada dostosowanie obecnie funkcjonującej kotłowni gazowej do zamontowania instalacji do przetwarzania i spalania biomasy oraz dostawę i montaż pieca do spalania biomasy, rębaka oraz linii do granulacji trocin. W ramach działania zostanie poniesiony wydatek: Wykonanie kompletnej instalacji przygotowania, podawania i spalania biomasy (III-IV kwartał 2017r.) Działanie 3. Usługi dotyczące kosztów zarządzania i nadzoru nad projektem. W ramach projektu niezbędne jest zlecenie usługi zarządzania i nadzoru nad realizacją projektu.(III-IV kwartał 2017r.) Okres realizacji proj: 09.02.2017 do 29.12.2017 r. Rozwiązania techniczne i technologiczne umożliwiają realizację projektu zgodnie z zakładanym harmonogramem. Po realizacji inwestycji infrastruktura będzie gotowa do wykorzystania w pełnej funkcjonalności. Wnioskodawca posiada niezbędne zasoby techniczne, kadrowe oraz doświadczenie gwarantujące prawidłową realizację projektu. (Polish)
0 references
The project is stationary. It will be located in the places Stobno, Kołbaskowo, Politbursk, voivodeships Zachodniopom. The project will consist of replacing a gas furnace for a pellet (biomass) with an installation capacity of 69 kW. The installation provides for the processing of waste production in the form of sawdust, sawdust, scraps, blocks (pellet) into fuel used for heating the production and office building of the Applicant. Currently, the fuel used to heat the building is high-methane natural gas, which will be replaced by biomass. STAGES OF PROJECT IMPLEMENTATION: Action 1 Preparation of project documentation – the project feasibility study (I quarter 2017) will be developed as part of the action. Installation and installation works together with the supply of necessary components of biomass combustion plants. The operation involves adapting the current gas boiler room to the installation of biomass processing and combustion plants and the supply and assembly of a biomass combustion furnace, chipper and sawdust granulation lines. As part of the action, expenditure will be paid: Complete installation of the preparation, administration and combustion of biomass (III-IV quarter of 2017) Action 3. Services related to project management and supervision costs. As part of the project, it is necessary to commission the management and supervision service over the implementation of the project.(III-IV quarter 2017) Period of project implementation: 09.02.2017 by 29.12.2017 Technical and technological solutions enable the project to be carried out according to the planned timetable. After the investment, the infrastructure will be ready to be used in full functionality. The applicant shall have the necessary technical, personnel and experience to guarantee the correct implementation of the project. (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-B014/17
0 references