Construction of a photovoltaic installation by means of the diversification of energy sources in Arcybabiuli. (Q137716): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The implementation of the project consists of the installation of a photovoltaic installation in Artzabiuli. The investment will cover the electricity part of a team of the applicant’s buildings. The aim of the project is to increase the use of energy from renewable sources in the commune of Szczecin. The investment consists of a comprehensive installation of solar modules (a total of 267 mono-crystalline modules having a nominal output of 340...)
(‎Created claim: summary (P836): The project consists of the installation of a photovoltaic installation in the Archbishop of the Higher Seminary in Szczecin. The investment will serve to satisfy part of the electricity of the complex of buildings of the applicant. The main objective of the project is to increase the use of energy from renewable sources in the City of Szczecin. The investment includes a comprehensive assembly of photovoltaic modules (a total of 267 monocrystall...)
Property / summary
 
The project consists of the installation of a photovoltaic installation in the Archbishop of the Higher Seminary in Szczecin. The investment will serve to satisfy part of the electricity of the complex of buildings of the applicant. The main objective of the project is to increase the use of energy from renewable sources in the City of Szczecin. The investment includes a comprehensive assembly of photovoltaic modules (a total of 267 monocrystalline modules with rated power of 340 Wp each). The total estimated value of installed power will be 90,76 kWp. Detailed data on the location are presented in p. A.4 of the application for funding. The currently requested project is naturally linked to the abovementioned investment: “Termomodernisation of the House of Buildings Team of the Higher Seminary in Szczecin”, which consisted of the energy modernisation of buildings to which electricity will be supplied from a co-financed source as part of the current project. Detailed data are provided in point B.11 of the proposal and in 3.1.2 SW. Output indicators: Number of units of electricity generation from RES [pcs] – 4 Number of built units of electricity generation from RES [pcs] – 4 Detailed data on product indicators are presented in the application for co-financing in Mr E.1. The proposed project is of a stationary nature. The project will be implemented during the period: 29.02.2016 (start of preparatory work) – 20.12.2017 (financial completion of the project after acceptance in kind). (English)
Property / summary: The project consists of the installation of a photovoltaic installation in the Archbishop of the Higher Seminary in Szczecin. The investment will serve to satisfy part of the electricity of the complex of buildings of the applicant. The main objective of the project is to increase the use of energy from renewable sources in the City of Szczecin. The investment includes a comprehensive assembly of photovoltaic modules (a total of 267 monocrystalline modules with rated power of 340 Wp each). The total estimated value of installed power will be 90,76 kWp. Detailed data on the location are presented in p. A.4 of the application for funding. The currently requested project is naturally linked to the abovementioned investment: “Termomodernisation of the House of Buildings Team of the Higher Seminary in Szczecin”, which consisted of the energy modernisation of buildings to which electricity will be supplied from a co-financed source as part of the current project. Detailed data are provided in point B.11 of the proposal and in 3.1.2 SW. Output indicators: Number of units of electricity generation from RES [pcs] – 4 Number of built units of electricity generation from RES [pcs] – 4 Detailed data on product indicators are presented in the application for co-financing in Mr E.1. The proposed project is of a stationary nature. The project will be implemented during the period: 29.02.2016 (start of preparatory work) – 20.12.2017 (financial completion of the project after acceptance in kind). (English) / rank
 
Normal rank
Property / summary: The project consists of the installation of a photovoltaic installation in the Archbishop of the Higher Seminary in Szczecin. The investment will serve to satisfy part of the electricity of the complex of buildings of the applicant. The main objective of the project is to increase the use of energy from renewable sources in the City of Szczecin. The investment includes a comprehensive assembly of photovoltaic modules (a total of 267 monocrystalline modules with rated power of 340 Wp each). The total estimated value of installed power will be 90,76 kWp. Detailed data on the location are presented in p. A.4 of the application for funding. The currently requested project is naturally linked to the abovementioned investment: “Termomodernisation of the House of Buildings Team of the Higher Seminary in Szczecin”, which consisted of the energy modernisation of buildings to which electricity will be supplied from a co-financed source as part of the current project. Detailed data are provided in point B.11 of the proposal and in 3.1.2 SW. Output indicators: Number of units of electricity generation from RES [pcs] – 4 Number of built units of electricity generation from RES [pcs] – 4 Detailed data on product indicators are presented in the application for co-financing in Mr E.1. The proposed project is of a stationary nature. The project will be implemented during the period: 29.02.2016 (start of preparatory work) – 20.12.2017 (financial completion of the project after acceptance in kind). (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:19, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic installation by means of the diversification of energy sources in Arcybabiuli.
Project in Poland financed by DG Regio

    Statements

    0 references
    656,781.4 zloty
    0 references
    157,627.54 Euro
    13 January 2020
    0 references
    772,684.91 zloty
    0 references
    185,444.38 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 February 2016
    0 references
    28 February 2019
    0 references
    ARCYBISKUPIE WYŻSZE SEMINARIUM DUCHOWNE W SZCZECINIE
    0 references
    0 references
    Realizacja projektu polega na montażu instalacji fotowoltaicznej w Arcybiskupim Wyższym Seminarium Duchownym w Szczecinie. Inwestycja będzie służyła zaspokojeniu części w zakresie energii elektrycznej zespołu budynków wnioskodawcy. Celem głównym projektu jest wzrost wykorzystania energii ze źródeł odnawialnych na terenie Gminy Miasto Szczecin. Inwestycja obejmuje kompleksowy montaż modułów fotowoltaicznych (łącznie 267 modułów monokrystalicznych o mocy znamionowej 340 Wp każdy). Łączna przewidywana wartość zainstalowanej mocy wyniesie 90,76 kWp. Szczegółowe dane, dotyczące lokalizacji zostały zaprezentowane w p. A.4 wniosku o dofinansowanie. Aktualnie wnioskowany projekt jest w sposób naturalny powiązany ze zrealizowaną wcześniej w/w inwestycją pn.: „Termomodernizacja Zespołu Budynków Arcybiskupiego Wyższego Seminarium Duchownego w Szczecinie”, która polegała na modernizacji energetycznej budynków, do których będzie dostarczana energia elektryczna z dofinansowanego źródła w ramach składanego obecnie projektu. Szczegółowe dane zostały przedstawione w p. B.11 wniosku oraz w p. 3.1.2 SW. Wskaźniki produktu: Liczba jednostek wytwarzania energii elektrycznej z OZE [szt.] – 4 Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE [szt.] - 4 Szczegółowe dane, dotyczące wskaźników produktów zostały zaprezentowane w p. E.1 wniosku o dofinansowanie. Wnioskowany projekt ma charakter stacjonarny. Projekt będzie zrealizowany w okresie: 29.02.2016 (rozpoczęcie prac przygotowawczych) – 20.12.2017 (finansowe zakończenie realizacji projektu po dokonaniu odbioru rzeczowego). (Polish)
    0 references
    The project consists of the installation of a photovoltaic installation in the Archbishop of the Higher Seminary in Szczecin. The investment will serve to satisfy part of the electricity of the complex of buildings of the applicant. The main objective of the project is to increase the use of energy from renewable sources in the City of Szczecin. The investment includes a comprehensive assembly of photovoltaic modules (a total of 267 monocrystalline modules with rated power of 340 Wp each). The total estimated value of installed power will be 90,76 kWp. Detailed data on the location are presented in p. A.4 of the application for funding. The currently requested project is naturally linked to the abovementioned investment: “Termomodernisation of the House of Buildings Team of the Higher Seminary in Szczecin”, which consisted of the energy modernisation of buildings to which electricity will be supplied from a co-financed source as part of the current project. Detailed data are provided in point B.11 of the proposal and in 3.1.2 SW. Output indicators: Number of units of electricity generation from RES [pcs] – 4 Number of built units of electricity generation from RES [pcs] – 4 Detailed data on product indicators are presented in the application for co-financing in Mr E.1. The proposed project is of a stationary nature. The project will be implemented during the period: 29.02.2016 (start of preparatory work) – 20.12.2017 (financial completion of the project after acceptance in kind). (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A119/16
    0 references