Construction of a PV power of up to 40 kW at a fuel station PB in the sea Ustrolec (Q137699): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project applicant is Dariusz Stegenta ‘PB’. The project will be located at ul. Kołobrzeg, Kołobrzeg, Poland 1A, 78-111, West Pomerania Province. The project will consist of the construction of a micro-PV of up to 40 kW on the roof of the existing petrol station. The applicant shall have the necessary documents to start the implementation of the project: the technical documentation of the investment (installation concept). The time limit fo...) |
(Created claim: summary (P836): The project applicant is Dariusz Stegienta “PB”. The implementation of the project will be located at ul. Kołobrzeska 1A, 78-111 Maritime Ustronie, Zachodniopomorskie Voivodeship. The project will consist of the construction of a photovoltaic micro-installation with power up to 40 kW on the roof of an existing gas station. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installati...) |
||||||||||||||
Property / summary | |||||||||||||||
The project applicant is Dariusz Stegienta “PB”. The implementation of the project will be located at ul. Kołobrzeska 1A, 78-111 Maritime Ustronie, Zachodniopomorskie Voivodeship. The project will consist of the construction of a photovoltaic micro-installation with power up to 40 kW on the roof of an existing gas station. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installation concept). The date of implementation of the investment was specified: — commencement of the project: 01.11.2016r., – completion of the project: 30.06.2017r. The project provided for 2 Task: — Task No 1 “Construction of photovoltaic installations up to 40 kW” – Task No. 2 “Promotion of the project”. As part of the implementation of the project, the following indicators will be achieved: Of the product: — Number of units of electricity generation (1 units), – Number of built units of electricity generation (1 pieces). Result: — Estimated annual decrease in greenhouse gas emissions (31.476 tonnes CO2) – Manufacture of electricity from newly built RES installations (37.854 MWhe/year). (English) | |||||||||||||||
Property / summary: The project applicant is Dariusz Stegienta “PB”. The implementation of the project will be located at ul. Kołobrzeska 1A, 78-111 Maritime Ustronie, Zachodniopomorskie Voivodeship. The project will consist of the construction of a photovoltaic micro-installation with power up to 40 kW on the roof of an existing gas station. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installation concept). The date of implementation of the investment was specified: — commencement of the project: 01.11.2016r., – completion of the project: 30.06.2017r. The project provided for 2 Task: — Task No 1 “Construction of photovoltaic installations up to 40 kW” – Task No. 2 “Promotion of the project”. As part of the implementation of the project, the following indicators will be achieved: Of the product: — Number of units of electricity generation (1 units), – Number of built units of electricity generation (1 pieces). Result: — Estimated annual decrease in greenhouse gas emissions (31.476 tonnes CO2) – Manufacture of electricity from newly built RES installations (37.854 MWhe/year). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project applicant is Dariusz Stegienta “PB”. The implementation of the project will be located at ul. Kołobrzeska 1A, 78-111 Maritime Ustronie, Zachodniopomorskie Voivodeship. The project will consist of the construction of a photovoltaic micro-installation with power up to 40 kW on the roof of an existing gas station. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installation concept). The date of implementation of the investment was specified: — commencement of the project: 01.11.2016r., – completion of the project: 30.06.2017r. The project provided for 2 Task: — Task No 1 “Construction of photovoltaic installations up to 40 kW” – Task No. 2 “Promotion of the project”. As part of the implementation of the project, the following indicators will be achieved: Of the product: — Number of units of electricity generation (1 units), – Number of built units of electricity generation (1 pieces). Result: — Estimated annual decrease in greenhouse gas emissions (31.476 tonnes CO2) – Manufacture of electricity from newly built RES installations (37.854 MWhe/year). (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:09, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a PV power of up to 40 kW at a fuel station PB in the sea Ustrolec |
Project in Poland financed by DG Regio |
Statements
186,227.35 zloty
0 references
219,091.0 zloty
0 references
85.0 percent
0 references
1 November 2016
0 references
30 June 2017
0 references
DARIUSZ STEGIENTA "PB"
0 references
Wnioskodawcą projektu jest Dariusz Stegienta "PB". Realizacja projektu zostanie zlokalizowana przy ul. Kołobrzeskiej 1A, 78-111 Ustronie Morskie, Województwo Zachodniopomorskie. Realizacja projektu będzie polegała na budowie mikroinstalacji fotowoltaicznej o mocy do 40 kW na dachu istniejącej stacji benzynowej. Wnioskodawca posiada dokumenty niezbędne do rozpoczęcia realizacji projektu: dokumentację techniczną inwestycji (koncepcja instalacji). Termin realizacji inwestycji został określony: - rozpoczęcie realizacji projektu: 01.11.2016r., - zakończenie realizacji projektu: 30.06.2017r. W ramach projektu zostały przewidziane 2 Zadana: - Zadanie nr 1 „Budowa instalacji fotowoltaicznej o mocy do 40kW”, - Zadanie nr 2 „Promocja projektu”. W ramach realizacji projektu zostaną osiągnięte wskaźniki: Produktu: - Liczba jednostek wytwarzania energii elektrycznej (1 szt.), - Liczba wybudowanych jednostek wytwarzania energii elektrycznej (1 szt.). Rezultatu: - Szacowany roczny spadek emisji gazów cieplarnianych (31,476 ton równoważnika CO2) - Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE (37,854 MWhe/ rok). (Polish)
0 references
The project applicant is Dariusz Stegienta “PB”. The implementation of the project will be located at ul. Kołobrzeska 1A, 78-111 Maritime Ustronie, Zachodniopomorskie Voivodeship. The project will consist of the construction of a photovoltaic micro-installation with power up to 40 kW on the roof of an existing gas station. The applicant shall have the necessary documents to start the project: technical documentation of the investment (installation concept). The date of implementation of the investment was specified: — commencement of the project: 01.11.2016r., – completion of the project: 30.06.2017r. The project provided for 2 Task: — Task No 1 “Construction of photovoltaic installations up to 40 kW” – Task No. 2 “Promotion of the project”. As part of the implementation of the project, the following indicators will be achieved: Of the product: — Number of units of electricity generation (1 units), – Number of built units of electricity generation (1 pieces). Result: — Estimated annual decrease in greenhouse gas emissions (31.476 tonnes CO2) – Manufacture of electricity from newly built RES installations (37.854 MWhe/year). (English)
21 October 2020
0 references
Identifiers
RPZP.02.10.00-32-A059/16
0 references