Installation of a photovoltaic renewable energy source for PHU Orion Andrzej Ciuraj in Szczecin (Q137691): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): The planned investment will consist of the placing of a 39,22kWp terrestrial photovoltaic installation as a device for direct energy conversion of solar radiation to electricity. The main purpose of the project is to use a photovoltaic installation as an alternative source of electricity for the operation of the business. Project implementation and, thanks to it, the installation of a photovoltaic installation will secure about 48 % of the ele...)
(‎Created claim: summary (P836): The planned investment will consist of the installation of a 39.22 kWp terrestrial photovoltaic installation, which is a device for direct conversion of solar radiation to electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. The implementation of the project, and thanks to it, the launched photovoltaic installation will secure about 48 % of t...)
Property / summary
 
The planned investment will consist of the installation of a 39.22 kWp terrestrial photovoltaic installation, which is a device for direct conversion of solar radiation to electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. The implementation of the project, and thanks to it, the launched photovoltaic installation will secure about 48 % of the electricity demand. The remaining electricity will be sourced from conventional sources. This objective will be achieved through the implementation of the following actions, which consist of a timetable in kind and financial for the project: 1. Preparatory work (documentation on feasibility study, installation design). 2. Construction and assembly work related to the preparation of infrastructure consisting of: earthworks and construction of a frame with assembly system. 3. Purchase of fixed assets – photovoltaic installation, consisting of: — 148 units of photovoltaic panels with a capacity of 265 W, – 1 piece of inverter, – 1 terrestrial mounting system, – 900 meters of solar wire, – 3 units of overvoltage protection, – 76 pieces of power optimisation. 4. Promotion of the project (table, marking, info on the website). The total investment cost of PLN 462 480.00, and the value of eligible costs is PLN 376 000.00. Implementation of the project will take place during the period: The project is stationary and will be implemented in a hotel – banquet facility owned by PHU Orion Andrzej Ciuraj in Szczecin. The building is located on Radosna Street in Szczecin. The Applicant will be directly responsible for the implementation of the project. The implementation of the project does not require any applications or construction permits, and the commissioning of the installation does not require any concessions or permits, but only a declaration. (English)
Property / summary: The planned investment will consist of the installation of a 39.22 kWp terrestrial photovoltaic installation, which is a device for direct conversion of solar radiation to electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. The implementation of the project, and thanks to it, the launched photovoltaic installation will secure about 48 % of the electricity demand. The remaining electricity will be sourced from conventional sources. This objective will be achieved through the implementation of the following actions, which consist of a timetable in kind and financial for the project: 1. Preparatory work (documentation on feasibility study, installation design). 2. Construction and assembly work related to the preparation of infrastructure consisting of: earthworks and construction of a frame with assembly system. 3. Purchase of fixed assets – photovoltaic installation, consisting of: — 148 units of photovoltaic panels with a capacity of 265 W, – 1 piece of inverter, – 1 terrestrial mounting system, – 900 meters of solar wire, – 3 units of overvoltage protection, – 76 pieces of power optimisation. 4. Promotion of the project (table, marking, info on the website). The total investment cost of PLN 462 480.00, and the value of eligible costs is PLN 376 000.00. Implementation of the project will take place during the period: The project is stationary and will be implemented in a hotel – banquet facility owned by PHU Orion Andrzej Ciuraj in Szczecin. The building is located on Radosna Street in Szczecin. The Applicant will be directly responsible for the implementation of the project. The implementation of the project does not require any applications or construction permits, and the commissioning of the installation does not require any concessions or permits, but only a declaration. (English) / rank
 
Normal rank
Property / summary: The planned investment will consist of the installation of a 39.22 kWp terrestrial photovoltaic installation, which is a device for direct conversion of solar radiation to electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. The implementation of the project, and thanks to it, the launched photovoltaic installation will secure about 48 % of the electricity demand. The remaining electricity will be sourced from conventional sources. This objective will be achieved through the implementation of the following actions, which consist of a timetable in kind and financial for the project: 1. Preparatory work (documentation on feasibility study, installation design). 2. Construction and assembly work related to the preparation of infrastructure consisting of: earthworks and construction of a frame with assembly system. 3. Purchase of fixed assets – photovoltaic installation, consisting of: — 148 units of photovoltaic panels with a capacity of 265 W, – 1 piece of inverter, – 1 terrestrial mounting system, – 900 meters of solar wire, – 3 units of overvoltage protection, – 76 pieces of power optimisation. 4. Promotion of the project (table, marking, info on the website). The total investment cost of PLN 462 480.00, and the value of eligible costs is PLN 376 000.00. Implementation of the project will take place during the period: The project is stationary and will be implemented in a hotel – banquet facility owned by PHU Orion Andrzej Ciuraj in Szczecin. The building is located on Radosna Street in Szczecin. The Applicant will be directly responsible for the implementation of the project. The implementation of the project does not require any applications or construction permits, and the commissioning of the installation does not require any concessions or permits, but only a declaration. (English) / qualifier
 
point in time: 21 October 2020
Timestamp+2020-10-21T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 19:09, 21 October 2020

Project in Poland financed by DG Regio
Language Label Description Also known as
English
Installation of a photovoltaic renewable energy source for PHU Orion Andrzej Ciuraj in Szczecin
Project in Poland financed by DG Regio

    Statements

    0 references
    317,475.0 zloty
    0 references
    76,194.0 Euro
    13 January 2020
    0 references
    373,500.0 zloty
    0 references
    89,640.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 May 2016
    0 references
    15 February 2019
    0 references
    PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE ORION ANDRZEJ CIURAJ
    0 references
    0 references
    Planowana inwestycja będzie polegać na umieszczeniu naziemnej instalacji fotowoltaicznej o mocy 39,22 kWp, będącej urządzeniem służącym do bezpośredniej konwersji energii promieniowania słonecznego na energię elektryczną. Głównym celem realizacji projektu, jest wykorzystanie instalacji fotowoltaicznej jako alternatywnego źródła energii elektrycznej na potrzeby funkcjonowania przedsiębiorstwa. Realizacja projektu, a dzięki niej uruchomiona instalacja fotowoltaiczna zabezpieczy około 48% zapotrzebowania na energię elektryczną. Pozostała energia elektryczna będzie pozyskiwana ze źródeł konwencjonalnych. Cel ten zostanie osiągnięty poprzez realizację następujących działań, które składają się na harmonogram rzeczowo – finansowy projektu: 1. Prace przygotowawcze (dokumentacja dotycząca studium wykonalności, projekt instalacji). 2. Prace budowlano montażowo związane z przygotowaniem infrastruktury na które składają się: prace ziemne oraz wykonanie stelaża z systemem montażowym. 3. Zakup środków trwałych - instalacji fotowoltaicznej, w skład której wchodzą: - 148 sztuk paneli fotowoltaiczne o mocy 265 W, - 1 sztuka inwertera, - 1 system montażowy naziemny, - 900 metrów przewodu solarnego, - 3 szt. ochrony przepięciowej, - 76 sztuk optymalizatora mocy. 4. Promocja projektu (tablica, oznakowanie, info na stronie www). Całkowity koszt inwestycji 462 480,00 zł brutto, a wartość kosztów kwalifikowanych to 376 000,00 zł. Realizacja projektu odbywać się będzie w okresie: II kwartał 2016 - I kwartał 2017.Projekt ma charakter stacjonarny i będzie realizowany w obiekcie hotelowy – bankietowym, którego właścicielem jest PHU Orion Andrzej Ciuraj w Szczecinie. Budynek zlokalizowany jest przy ulicy Radosnej w Szczecinie. Za wdrożenie projektu odpowiadał będzie bezpośrednio Wnioskodawca. Realizacja projektu nie wymaga żadnych zgłoszeń ani pozwoleń budowlanych, a uruchomienie instalacji nie wymaga żadnych koncesji ani pozwoleń, a jedynie zgłoszenia. (Polish)
    0 references
    The planned investment will consist of the installation of a 39.22 kWp terrestrial photovoltaic installation, which is a device for direct conversion of solar radiation to electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. The implementation of the project, and thanks to it, the launched photovoltaic installation will secure about 48 % of the electricity demand. The remaining electricity will be sourced from conventional sources. This objective will be achieved through the implementation of the following actions, which consist of a timetable in kind and financial for the project: 1. Preparatory work (documentation on feasibility study, installation design). 2. Construction and assembly work related to the preparation of infrastructure consisting of: earthworks and construction of a frame with assembly system. 3. Purchase of fixed assets – photovoltaic installation, consisting of: — 148 units of photovoltaic panels with a capacity of 265 W, – 1 piece of inverter, – 1 terrestrial mounting system, – 900 meters of solar wire, – 3 units of overvoltage protection, – 76 pieces of power optimisation. 4. Promotion of the project (table, marking, info on the website). The total investment cost of PLN 462 480.00, and the value of eligible costs is PLN 376 000.00. Implementation of the project will take place during the period: The project is stationary and will be implemented in a hotel – banquet facility owned by PHU Orion Andrzej Ciuraj in Szczecin. The building is located on Radosna Street in Szczecin. The Applicant will be directly responsible for the implementation of the project. The implementation of the project does not require any applications or construction permits, and the commissioning of the installation does not require any concessions or permits, but only a declaration. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A047/16
    0 references