Thermal modernisation, reconstruction and overbuilding of the existing workshop building and economic building of the Municipality of White (Q137626): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The project consists of a complete energy modernisation of an existing workshop facility, a garage of the municipality of Biesiekiel in the town of Bieisiel. The workshop building and the economic building of the Municipality of White is a single-storey construction, which is not podpiwek, placed in a masonry structure with a usable surface of 393.30 m², of which as many as 303.9 m² occupy garages operated by the Gminne Technical Services. Thi...) |
(Created claim: summary (P836): The project consists of a complete energy modernisation of the existing workshop and garage facility of the Biesiekierz commune in Biesiekierz. The workshop and economic building of the Biesiekierz commune is a one-storey building, unreliable, built in a brick structure with a usable area of 393.30 m², of which as much as 303.9 m² occupies a garage used by the Municipal Technical Service. It was originally intended to serve as a firehouse, but d...) |
||||||||||||||
Property / summary | |||||||||||||||
The project consists of a complete energy modernisation of the existing workshop and garage facility of the Biesiekierz commune in Biesiekierz. The workshop and economic building of the Biesiekierz commune is a one-storey building, unreliable, built in a brick structure with a usable area of 393.30 m², of which as much as 303.9 m² occupies a garage used by the Municipal Technical Service. It was originally intended to serve as a firehouse, but due to the sufficient number of buildings for this purpose in the commune (there are four Volunteer Fire Brigades in the municipality, three of them have firehouses. One is not equipped with a vehicle, so there is no need for it). Construction works will be carried out, including: Demolition works; Concrete substrates and floor insulation; Carpentry and door and window locksmith; The flooring; Facades – warming, Electrical robots: Lighting installation; Lightning installation; Electrical tests and measurements + dismantling, sanitary robots and central heating: Installation of cold water – farm room, Installation of cold and hot water – social room, Installation of central heating. The project is fully ready for implementation- it has the necessary documentation to launch a tender for construction works. (English) | |||||||||||||||
Property / summary: The project consists of a complete energy modernisation of the existing workshop and garage facility of the Biesiekierz commune in Biesiekierz. The workshop and economic building of the Biesiekierz commune is a one-storey building, unreliable, built in a brick structure with a usable area of 393.30 m², of which as much as 303.9 m² occupies a garage used by the Municipal Technical Service. It was originally intended to serve as a firehouse, but due to the sufficient number of buildings for this purpose in the commune (there are four Volunteer Fire Brigades in the municipality, three of them have firehouses. One is not equipped with a vehicle, so there is no need for it). Construction works will be carried out, including: Demolition works; Concrete substrates and floor insulation; Carpentry and door and window locksmith; The flooring; Facades – warming, Electrical robots: Lighting installation; Lightning installation; Electrical tests and measurements + dismantling, sanitary robots and central heating: Installation of cold water – farm room, Installation of cold and hot water – social room, Installation of central heating. The project is fully ready for implementation- it has the necessary documentation to launch a tender for construction works. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The project consists of a complete energy modernisation of the existing workshop and garage facility of the Biesiekierz commune in Biesiekierz. The workshop and economic building of the Biesiekierz commune is a one-storey building, unreliable, built in a brick structure with a usable area of 393.30 m², of which as much as 303.9 m² occupies a garage used by the Municipal Technical Service. It was originally intended to serve as a firehouse, but due to the sufficient number of buildings for this purpose in the commune (there are four Volunteer Fire Brigades in the municipality, three of them have firehouses. One is not equipped with a vehicle, so there is no need for it). Construction works will be carried out, including: Demolition works; Concrete substrates and floor insulation; Carpentry and door and window locksmith; The flooring; Facades – warming, Electrical robots: Lighting installation; Lightning installation; Electrical tests and measurements + dismantling, sanitary robots and central heating: Installation of cold water – farm room, Installation of cold and hot water – social room, Installation of central heating. The project is fully ready for implementation- it has the necessary documentation to launch a tender for construction works. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:07, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation, reconstruction and overbuilding of the existing workshop building and economic building of the Municipality of White |
Project in Poland financed by DG Regio |
Statements
206,842.86 zloty
0 references
243,344.56 zloty
0 references
85.0 percent
0 references
1 December 2018
0 references
30 November 2019
0 references
GMINA BIESIEKIERZ
0 references
Projekt polega na kompletnej modernizacji energetycznej istniejącego obiektu warsztatowo – garażowego Gminy Biesiekierz w miejscowości Biesiekierz. Budynek warsztatowy i gospodarczy Gminy Biesiekierz jest obiektem jednokondygnacyjnym, niepodpiwniczonym, postawionym w konstrukcji murowanej o powierzchni użytkowej 393,30 m2, z której aż 303,9 m2 zajmuje garaż użytkowany przez Gminne Służby Techniczne. Pierwotnie obiekt ten miał pełnić funkcję remizy strażackiej, jednakże ze względu na wystarczającą ilość budynków o tym przeznaczeniu w gminie (W gminie występują cztery Ochotnicze Straże Pożarne, w tym trzy posiadają remizy. Jedna nie posiada na wyposażeniu pojazdu, w związku z czym nie występuje potrzeba). Wykonane będą roboty budowlane, w tym: Roboty rozbiórkowe; Podłoża betonowe i izolacje posadzek; Stolarka i ślusarka drzwiowa i okienna; Posadzki; Elewacje – docieplenia, Roboty elektryczne: Instalacja oświetleniowa; Instalacja odgromowa; Badania i pomiary elektryczne + demontaże, Roboty sanitarne i c.o.: Instalacja wody zimnej - pomieszczenie gospodarcze, Instalacja wody zimnej i ciepłej - pomieszczenie socjalne, Instalacja centralnego ogrzewania. Projekt jest w pełni gotowy do realizacji- posiada niezbędna dokumentację do ogłoszenia przetargu na roboty budowlane. (Polish)
0 references
The project consists of a complete energy modernisation of the existing workshop and garage facility of the Biesiekierz commune in Biesiekierz. The workshop and economic building of the Biesiekierz commune is a one-storey building, unreliable, built in a brick structure with a usable area of 393.30 m², of which as much as 303.9 m² occupies a garage used by the Municipal Technical Service. It was originally intended to serve as a firehouse, but due to the sufficient number of buildings for this purpose in the commune (there are four Volunteer Fire Brigades in the municipality, three of them have firehouses. One is not equipped with a vehicle, so there is no need for it). Construction works will be carried out, including: Demolition works; Concrete substrates and floor insulation; Carpentry and door and window locksmith; The flooring; Facades – warming, Electrical robots: Lighting installation; Lightning installation; Electrical tests and measurements + dismantling, sanitary robots and central heating: Installation of cold water – farm room, Installation of cold and hot water – social room, Installation of central heating. The project is fully ready for implementation- it has the necessary documentation to launch a tender for construction works. (English)
21 October 2020