(Removed claim: summary (P836): The project involves work to be carried out in the thermal modernisation of the three after-school villages of the municipality of Szczecinek, in the villages of Wilcoze Laski, Turowo and Parsęcko.Scope of the project: (1) insulation of the outer wall of the EPS 100 with a thickness of 16 cm and a coefficient of conductivity? = 0,036 W/mK, construction of new floor layers on the ground, insulation of the floor area on the ground with a thickne...) |
(Created claim: summary (P836): It is possible to warm up the outer walls with an EPS 100 with a thickness of 16 cm, and the coefficient of the interior of the interior of the interior of the interior of the roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a sheet,3) to demolish the top of the floor. In addition, it will be possible to use the full functionality of the infr...) |
||||||||||||||
Property / summary | |||||||||||||||
It is possible to warm up the outer walls with an EPS 100 with a thickness of 16 cm, and the coefficient of the interior of the interior of the interior of the interior of the roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a sheet,3) to demolish the top of the floor. In addition, it will be possible to use the full functionality of the infrastructure and it will not require additional activities (other inputs) in order to make full use of it.The commune also has the appropriate technical resources, resources and knowledge to ensure the operation of infr. after completion of the project (English) | |||||||||||||||
Property / summary: It is possible to warm up the outer walls with an EPS 100 with a thickness of 16 cm, and the coefficient of the interior of the interior of the interior of the interior of the roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a sheet,3) to demolish the top of the floor. In addition, it will be possible to use the full functionality of the infrastructure and it will not require additional activities (other inputs) in order to make full use of it.The commune also has the appropriate technical resources, resources and knowledge to ensure the operation of infr. after completion of the project (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: It is possible to warm up the outer walls with an EPS 100 with a thickness of 16 cm, and the coefficient of the interior of the interior of the interior of the interior of the roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a sheet,3) to demolish the top of the floor. In addition, it will be possible to use the full functionality of the infrastructure and it will not require additional activities (other inputs) in order to make full use of it.The commune also has the appropriate technical resources, resources and knowledge to ensure the operation of infr. after completion of the project (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 19:07, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Comprehensive deep energy renovation of public buildings — rural lighting in Turów, Parsvulled and Willial lakes |
Project in Poland financed by DG Regio |
Statements
558,484.9 zloty
0 references
657,041.09 zloty
0 references
85.0 percent
0 references
19 September 2016
0 references
28 February 2019
0 references
GMINA SZCZECINEK
0 references
Przedmiotem projektu jest dokonanie prac termomodernizacyjnych w trzech świetlicach wiejskich w Gminie Szczecinek,znajdujących się w miejscowościach Wilcze Laski,Turowo i Parsęcko.Zakres rzeczowy obejmuje prace:1) Ocieplenie ścian zewnętrznych styropianem EPS 100 o grubości 16 cm i współczynniku przewodności cieplnej ?=0,036 W/mk,2)Pokrycie dachu papą i blachodachówką,3)Rozbiórkę wierzchnich warstw istniejącej posadzki na gruncie,ocieplenie podłogi na gruncie polistyrenem ekstradowanym XPS grubości 5 cm o współczynniku przewodności cieplnej ?=0,034W/mK, wykonanie nowych warstw posadzki z płytek terakota,4)Wymianę okien drewnianych,5)Wymianę drzwi zewnętrznych,6)Wprowadzenie wentylacji mechanicznej nawiewno–wywiewnej z rekuperacją ciepła,7)Kompleksowa wymiana instalacji grzewczej poprzez wymianę kotła opalanego węglem na nowy kocioł opalany ekogroszkiem z automatyczną regulacją procesu spalania i zasobnikiem na opał,8)Remont schodów, oraz inne prace określone dla każdego obiektu osobno.Więcej szczegółów SW.2.1.2,3.1.3;4.1.3.2.Powyższe prace są konieczne aby zrealizować zaplanowany zakres związany z termomodernizacją i doprowadzić do zwiększenia efektywności energetycznej biektów.Termomodernizacji zostaną poddane 3 budynki o powierzchni 860,2 m2.Tym samym projekt doprowadzi do zm.emisji CO2 na tym obszarze aż o 150,7 tCO2 tj.o 65,46% (wartość pierwotna 230,2 ,wartość docelowa–79,5 toeCO2) rocznie oraz zm.zużycie energii pierwotnej w poszczególnych obiektach aż o 489991 kWh/rok,energii końcowej o 1601,4GJ/rok.Co ważne Gm.Szczecinek potwierdza, iż bezpośrednio po zakończeniu inwestycji możliwe będzie korzystanie z produktów wytworzonych w wyniku realizacji projektu. Dodatkowo możliwym będzie wykorzystanie pełnej funkcjonalności infrastruktury i nie będzie to wymagało dodatkowych działań (innych nakładów) w celu jej pełnego wykorzystania.Gmina posiada także odpowiednie zasoby techniczne,kadrowe i wiedzę gwarantującą uruchomienie funkcjonowania infr.po zakończeniu projekt (Polish)
0 references
It is possible to warm up the outer walls with an EPS 100 with a thickness of 16 cm, and the coefficient of the interior of the interior of the interior of the interior of the roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a roof with a sheet,3) to demolish the top of the floor. In addition, it will be possible to use the full functionality of the infrastructure and it will not require additional activities (other inputs) in order to make full use of it.The commune also has the appropriate technical resources, resources and knowledge to ensure the operation of infr. after completion of the project (English)
21 October 2020
0 references
Identifiers
RPZP.02.05.00-32-A036/16
0 references