The connection of the cycle routes to the city centre (Q137581): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): The object of the project is the construction of a cycle path of ca. 140 metres, which will combine other cycle routes designed and operated by other projects and, at the same time, the city centre with a planned hub. The project will also mark the construction of a cycle of a cycle path and a part of ul. Northern than the cycle road which is the object of the project to connect to the projected cycle road towards the hub and Koszalin. The mar...) |
(Created claim: summary (P836): The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this proj...) |
||||||||||||||
Property / summary | |||||||||||||||
The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this project to the connection with the designed bicycle road towards the interchange centre and Koszalin. The marking will include a section with a length of approx. 310 m. A necessary element of the project is the marking of the street section. North (170 m). This will mainly be an information label (directional) aimed at targeting cyclists on cycling roads so as to reach the street. The North did not continue to travel through county roads. In addition, the lighting of the new section of the connection of cycling routes will be realised. (English) | |||||||||||||||
Property / summary: The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this project to the connection with the designed bicycle road towards the interchange centre and Koszalin. The marking will include a section with a length of approx. 310 m. A necessary element of the project is the marking of the street section. North (170 m). This will mainly be an information label (directional) aimed at targeting cyclists on cycling roads so as to reach the street. The North did not continue to travel through county roads. In addition, the lighting of the new section of the connection of cycling routes will be realised. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this project to the connection with the designed bicycle road towards the interchange centre and Koszalin. The marking will include a section with a length of approx. 310 m. A necessary element of the project is the marking of the street section. North (170 m). This will mainly be an information label (directional) aimed at targeting cyclists on cycling roads so as to reach the street. The North did not continue to travel through county roads. In addition, the lighting of the new section of the connection of cycling routes will be realised. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:54, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | The connection of the cycle routes to the city centre |
Project in Poland financed by DG Regio |
Statements
53,148.0 zloty
0 references
203,990.45 zloty
0 references
26.05 percent
0 references
2 January 2020
0 references
30 June 2020
0 references
GMINA MIELNO
0 references
Przedmiotem projektu jest budowa drogi rowerowej o długości ok. 140 metrów, która będzie łączyć inne trasy rowerowe projektowane i realizowane w ramach innych projektów a jednocześnie centrum miasta z planowanym centrum przesiadkowym. W ramach projektu powstanie też oznakowanie wybudowanego odcinka drogi rowerowej oraz części ul. Północnej od drogi rowerowej, będącej przedmiotem niniejszego projektu do połączenia z projektowaną drogą rowerową w kierunku centrum przesiadkowego i Koszalina. Oznakowanie obejmie łącznie odcinek o długości ok. 310 m. Koniecznym elementem projektu jest oznakowanie odcinka ul. Północnej (170 m). Będzie to głównie oznakowanie informacyjne (kierunkowe), którego celem będzie nakierowanie rowerzystów na drogi rowerowe, tak aby dojeżdżając do ul. Północnej nie kontynuowali podróży drogami powiatowymi. Ponadto, zostanie zrealizowane oświetlenie nowego odcinka połączenia tras rowerowych. (Polish)
0 references
The object of the project is the construction of a bicycle road with a length of approx. 140 metres, which will combine other cycling routes designed and carried out under other projects and at the same time the city centre with the planned interchange centre. As part of the project, there will also be a marking of the built section of the bicycle road and part of the street. From the North from the bicycle road which is the subject of this project to the connection with the designed bicycle road towards the interchange centre and Koszalin. The marking will include a section with a length of approx. 310 m. A necessary element of the project is the marking of the street section. North (170 m). This will mainly be an information label (directional) aimed at targeting cyclists on cycling roads so as to reach the street. The North did not continue to travel through county roads. In addition, the lighting of the new section of the connection of cycling routes will be realised. (English)
21 October 2020
0 references
Identifiers
RPZP.02.03.00-32-0006/19
0 references