Construction of a communication infrastructure, including a cycle route connecting the town of the road traffic hub in Szczecin together with the promotion of alternatives to individual transport (Q137560): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Removed claim: summary (P836): The project ‘Construction of a communication infrastructure, including a cycle route connecting the town of the road traffic hub in Szczecin, together with the promotion of alternatives to individual transport’, shall cover, inter alia: Part of the municipality• Compensation of the ground and demolition works• Stabilisation of the ground floor• laying the kerbs on the concrete superstructure• construction of the pavement of a pavement of a pro...) |
||
Property / summary | |||
Property / summary: The project ‘Construction of a communication infrastructure, including a cycle route connecting the town of the road traffic hub in Szczecin, together with the promotion of alternatives to individual transport’, shall cover, inter alia: Part of the municipality• Compensation of the ground and demolition works• Stabilisation of the ground floor• laying the kerbs on the concrete superstructure• construction of the pavement of a pavement of a projected cycle path• performance of the horizontal and vertical markings of the district planned investment within the scope of the plan, includes: • the construction of a cycle path/cycle, the construction of pavements• reconstruction and extension of the existing junction to ul. The construction of a transfer terminal in Wołoczków, along with the parking space of type B & R• construction of a new construction of roads• rebuilding existing roads• clean-up of culverts• profiling and sowing green areas. The steps in the implementation of CZ. The municipal road: 3-4 quarters 2019 CZ. District — Road: 3 quarter 2019-3 quarters 2020 — Health: 1-2 quarters 2020 — Energy: 2-3 quarters 2020 The applicant (and the Partner) shall have, within the framework of the assets and administrative structures described, technical, personnel and knowledge to ensure that the infrastructure is put in place immediately after the end of the project (details: S3.2). The project will be carried out with the assistance of the Team Implementation of the Project and of the entities of the (see: S3.2.2) The project’s compliance with the provisions of point 1.2 of the selection procedure — type of project — 1 — investment indicated in the Strategy and implemented in the area of ITI SOM/functional area of the city — support for activities improving public communication — actions are taken in the area for which the PGN and the SUMP (SW 2.2.7) are created — the subject of the project is located within 10 km of the “Deep Sea” hub — investment linked to soft measures under PGN. (English) / rank | |||
Revision as of 18:54, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Construction of a communication infrastructure, including a cycle route connecting the town of the road traffic hub in Szczecin together with the promotion of alternatives to individual transport |
Project in Poland financed by DG Regio |
Statements
6,700,000.0 zloty
0 references
14,500,000.0 zloty
0 references
46.21 percent
0 references
8 August 2019
0 references
30 September 2020
0 references
GMINA DOBRA
0 references
Analizowane przedsięwzięcie pn. „Budowa infrastruktury komunikacyjnej, w tym trasy rowerowej łączącej miejscowość Dobra z węzłem przesiadkowym Głębokie w Szczecinie wraz z promocją rozwiązań alternatywnych wobec transportu indywidualnego” obejmuje swoim zakresem m.in.: CZĘŚĆ GMINNA • wyrównanie terenu i roboty rozbiórkowe • stabilizację podłoża gruntowego • ułożenie krawężników na ławie betonowej • wykonanie konstrukcji nawierzchni bitumicznej projektowanej drogi rowerowej • wykonanie oznakowania poziomego i pionowego CZĘŚĆ POWIATOWA Planowana inwestycja swoim zakresem obejmuje: • budowę ścieżki rowerowej / ciągu pieszo - rowerowego • budowę chodników • przebudowę i rozbudowę istniejącego skrzyżowania z ul. Słoneczną w Wołczkowie • budowę terminalu przesiadkowego w Wołczkowie wraz z miejscami parkingowymi typu B&R • wykonanie nowej konstrukcji jezdni • przebudowę istniejących zjazdów • oczyszczenie przepustów • wyprofilowanie i obsianie terenów zielonych. Etapy realizacji CZ. GMINNA - br. drogowa: 3-4 kw. 2019 CZ. POWIATOWA - br. drogowa: 3 kw. 2019 – 3 kw. 2020 - br. sanitarna: 1-2 kw. 2020 - br. energetyczna: 2-3 kw. 2020 Wnioskodawca ( oraz Partner) posiada w ramach opisanych struktur majątkowo-administracyjnych zasoby techniczne, kadrowe i wiedzę gwarantujące uruchomienie infrastruktury bezpośrednio po zakończeniu projektu (szczegóły: SW 3.2). Projekt będzie realizowany za pomocą Zespołu ds. Wdrażania Projektu oraz podmiotów zew. (patrz: SW 3.2.2) Zgodność projektu z zapisami pkt 1.2 Regulaminu naboru - typ projektu - 1 - inwestycja wskazana w Strategii i wdrażana na obszarze ZIT SOM / obszar funkcjonalny miasta - wsparcie przeznaczone na działania usprawniające komunikację publiczną - działania podejmowane są na obszarze, dla którego stworzony został PGN oraz PZMM(SW 2.2.7) - przedmiot projektu znajduje się w obrębie poniżej 10 km od centrum przesiadkowego „Głębokie” - inwestycja powiązana z działaniami „miękkimi” w ramach PGN (Polish)
0 references
Identifiers
RPZP.02.02.00-32-0007/18
0 references