Increasing the level of innovation and the competitiveness of GIPO Sp. z o.o. by means of an investment in the extension of the plant and innovative production solutions (Q137340): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: summary (P836): In the event of no funding being awarded to ROP WZ, the Company assumes production on the basis of an attempt to upgrade an existing establishment. The absence of a grant will limit the scope of the innovative production solutions of the CNC and cancel the purchase of equipment for the research into the NDT. Under this option, the company would only purchase much cheaper machines and thus much less innovative. The investment in new machinery,...) |
(Created claim: summary (P836): In the event of not receiving funding from RPO WZ, the Company assumes production based on an attempt to modernise the existing plant. The lack of subsidies will limit the range of innovative CNC production solutions and the abandonment of the purchase of NDT testing equipment. In this variant, the Company would purchase only a lot of cheaper machines and thus much less innovative. The investment in new machinery, due to the lack of suitable sur...) |
||||||||||||||
Property / summary | |||||||||||||||
In the event of not receiving funding from RPO WZ, the Company assumes production based on an attempt to modernise the existing plant. The lack of subsidies will limit the range of innovative CNC production solutions and the abandonment of the purchase of NDT testing equipment. In this variant, the Company would purchase only a lot of cheaper machines and thus much less innovative. The investment in new machinery, due to the lack of suitable surface, would only cover the purchase of a lathe and stainless steel milling machines as necessary for the basic processing of stainless steel – other activities such as welding, cutting, cleaning and grinding would be carried out by subcontractors. The scope of the investment would therefore be limited to the minimum necessary, and in time the introduction of further technological innovations in the production process would be postponed. (English) | |||||||||||||||
Property / summary: In the event of not receiving funding from RPO WZ, the Company assumes production based on an attempt to modernise the existing plant. The lack of subsidies will limit the range of innovative CNC production solutions and the abandonment of the purchase of NDT testing equipment. In this variant, the Company would purchase only a lot of cheaper machines and thus much less innovative. The investment in new machinery, due to the lack of suitable surface, would only cover the purchase of a lathe and stainless steel milling machines as necessary for the basic processing of stainless steel – other activities such as welding, cutting, cleaning and grinding would be carried out by subcontractors. The scope of the investment would therefore be limited to the minimum necessary, and in time the introduction of further technological innovations in the production process would be postponed. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: In the event of not receiving funding from RPO WZ, the Company assumes production based on an attempt to modernise the existing plant. The lack of subsidies will limit the range of innovative CNC production solutions and the abandonment of the purchase of NDT testing equipment. In this variant, the Company would purchase only a lot of cheaper machines and thus much less innovative. The investment in new machinery, due to the lack of suitable surface, would only cover the purchase of a lathe and stainless steel milling machines as necessary for the basic processing of stainless steel – other activities such as welding, cutting, cleaning and grinding would be carried out by subcontractors. The scope of the investment would therefore be limited to the minimum necessary, and in time the introduction of further technological innovations in the production process would be postponed. (English) / qualifier | |||||||||||||||
point in time: 21 October 2020
|
Revision as of 18:26, 21 October 2020
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increasing the level of innovation and the competitiveness of GIPO Sp. z o.o. by means of an investment in the extension of the plant and innovative production solutions |
Project in Poland financed by DG Regio |
Statements
3,330,000.0 zloty
0 references
7,400,000.0 zloty
0 references
45.0 percent
0 references
2 November 2016
0 references
31 August 2018
0 references
GIPO SP. Z O.O.
0 references
W przypadku nie otrzymania dofinansowania ze środków RPO WZ, Spółka zakłada produkcję w oparciu o próbę modernizacji istniejącego zakładu. Brak dotacji ograniczy zakres innowacyjnych rozwiązań produkcyjnych CNC oraz rezygnację z zakupu wyposażenia do badań NDT. W tym wariancie Spółka dokonałaby zakupu wyłącznie dużo tańszych maszyn i przez to dużo mniej innowacyjnych. Inwestycja w nowe maszyny, ze względu na brak odpowiedniej powierzchni, objęłaby wyłącznie zakup tokarki oraz frezarki do stali nierdzewnej, jako niezbędnych w podstawowej obróbce stali nierdzewnej – pozostałe czynności takie jak spawanie, cięcie, czyszczenie i szlifowanie realizowane byłyby u podwykonawców. Zakres inwestycji zostałby więc ograniczony do niezbędnego minimum, oddalając w czasie wprowadzanie kolejnych technologicznych nowinek w procesie produkcyjnym. (Polish)
0 references
In the event of not receiving funding from RPO WZ, the Company assumes production based on an attempt to modernise the existing plant. The lack of subsidies will limit the range of innovative CNC production solutions and the abandonment of the purchase of NDT testing equipment. In this variant, the Company would purchase only a lot of cheaper machines and thus much less innovative. The investment in new machinery, due to the lack of suitable surface, would only cover the purchase of a lathe and stainless steel milling machines as necessary for the basic processing of stainless steel – other activities such as welding, cutting, cleaning and grinding would be carried out by subcontractors. The scope of the investment would therefore be limited to the minimum necessary, and in time the introduction of further technological innovations in the production process would be postponed. (English)
21 October 2020
0 references
Identifiers
RPZP.01.05.00-32-0077/16
0 references